BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Demolition, site work, renovation and addition to a water / sewer project in San Bruno, California. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work includes, but is not limited to: rehabilitation of the Lake and Sneath Potable Water Pump Stations. Work includes, but is not limited to the mechanical piping, new HVAC new electrical and instrumentation, existing electrical/instrumentation improvements, building refurbishment and improvements to meet current codes, civil site improvements and new generators. There is a building addition at the Lake Pump Station. A temporary bypass pumping system is necessary CONTRACT TIME: All work under this contract shall be completed within 300 Working Days from the Notice to Proceed effective date. The City shall assess liquidated damages in the amount of $500 per Working Days for delays in completion of the project, as provided in the Contract Documents. REQUIRED CONTRACTOR'S LICENSE(S): A California Class "A" contractor's license is required to bid on this contract. Joint ventures must secure a joint venture license prior to award of this Contract Cash, cashier's check or certified check, payable to the order of the City of San Bruno, of not less than ten percent (10%) of the bid, or a bond in said amount payable to the City of San Bruno and signed by the Bidder and a corporate surety shall accompany the bid CONTRACT TIME: All work under this contract shall be completed within 300 Working Days from the Notice to Proceed effective date. The City shall assess liquidated damages in the amount of $500 per Working Days for delays in completion of the project, as provided in the Contract Documents QUESTIONS regarding the Project Plans or Specifications, bid process, and contractual issues may be directed to Camila Arcayena, Associate Engineer, at (650)754-2388 The City specifically reserves the right, in its sole discretion, to reject any or all bids, to re-bid, or to waive inconsequential defects or minor irregularities in the bids not involving time, price or quality of the work.

Award

Water / Sewer

$6,085,840.00

Public - City

Addition, Demolition, Renovation, Site Work

86

29

16

9

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
449
Active Projects
200
Bidding Soon
2,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

June 19, 2026

Project location map

To Be Determined, San Bruno, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.