BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2026 at 8:00 PM

Updated March 31, 2026

Renovation of a playground / park / athletic field in Dunstable, Massachusetts. Completed plans call for the renovation of a playground / park / athletic field.

The Parks Commission is soliciting proposals to repair, rehabilitate, and restore the Babe Ruth Baseball Field located in Town Center behind the Dunstable Fire Station at 28 Pleasant Street. Project Background The Parks Commission is soliciting proposals to repair, rehabilitation, and restore the Babe Ruth Baseball Field located in Town Center. The baseball field is located in Town Center behind the Dunstable Fire Station at 28 Pleasant Street. Existing Field Conditions Babe Ruth Field o Infield: Severely overrun with weeds; requires realignment, leveling, and full restoration. o Structures: Backstop, dugout fences, benches, and bleachers are in good condition. Project Scope Babe Ruth Field Improvements This project focuses on preparing the Babe Ruth Field for safe and effective use during the Spring 2026 season. Field Rehabilitation and Safety Enhancements All Clay Skin Areas o Measure and mark all clay to turf Edge all clay borders o Strip all vegetation from the baselines and clay areas o Grade baselines, rebuild pitcher's mound and plate circle o Provide and install all bases, pitcher's mound, base anchors Infield and Foul Line Realignment o Re-establish accurate infield geometry and foul lines. o Replace and install foul poles to clearly define field boundaries. o Two foul poles consisting of round, yellow-coated steel tube poles o Poles installed plumb and set in concrete foundations o Height, diameter, and placement shall meet baseball field standards o Contractor will verify final locations with Owner prior to installation Surface Grading and Rut Repair o Fill in all ruts and uneven areas throughout the field. o Spot seed rutted areas as needed to restore turf integrity. Access Path Cleanup o Clear the path from the rear of Swallow Union School to ensure safe and convenient access. Work is expected to be performed between the hours of 8:00 AM and 5:00 PM, Monday thru Friday, unless otherwise approved by the Town of Dunstable All inquiries regarding this invitation shall be directed to the Town Administrator’s Office in writing: Jason Silva, Email – jsilva@dunstable-ma.gov.

Award

Playgrounds / Parks / Athletic Fields

$33,800.00

Public - City

Renovation

3

4

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
8
Bidding Soon
2,547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2026

March 27, 2026

Project location map

28 Pleasant St, Dunstable, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.