BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a mixed-use development in Aurora, Illinois. Completed plans call for the renovation of a 10,800-square-foot educational facility.

Oswego CUSD 308 is requesting bids to provide floor removal and installation for elementary gymnasiums. All vendors must comply with applicable Illinois law requiring payment of prevailing wage by contractors working on publicly funded projects, and with Illinois statutory requirements regarding labor, including Equal Employment Opportunity Laws. The District reserves the right to reject any and all proposals or parts thereof and waive any irregularities or informalities. The current project is to remove/install Luxury Vinyl Flooring (LVT), multi-purpose, or similar option flooring in current carpeted gym floors in 2 buildings. Additional flooring options will be considered. Please bid on all options. Below are basic specifications that will be required in each proposal: _ Removal and disposal of all existing floor coverings _ Testing of slab for flatness, smoothness, and hardness _ Moisture and air quality testing before or after leveling occurs _ Tenting or other protection needed in the area due to exposure of silica dust _ Floor surveys _ Plywood subfloor _ Mock ups _ Asbestos control or abatement _ Shot blasting, scarifying, brush hammering, shaving, grinding, sanding, or any other form of mechanical floor preparation _ Surface preparation, including leveling, skim coating, and spackling (where material is installed on walls) _ Transition/ramping to other flooring _ Cleaning, sealing, buffing, or waxing of resilient or specialty products _ Furnishing or installing entrance mats, mounted carpet mats, frames, or related items _ Factory pre-formed base corners _ Supplying or application of concrete sealer _ Pattern matching & borders _ Removal and disposal of any waste and debris generated during the installation _ Cleaning and vacuuming _ Unless specified otherwise in the proposal, all work will be performed on regular time, Monday through Friday Blueprint Maps are viewable in Exhibit B Approximate square footage in each area is: Wheatlands Elementary-5400 Square feet Lakewood Creek Elementary-5400 Square feet Questions related to RFP may be submitted, in writing, via email to kearwood@sd308.org by March 6th 2026 by 12pm. No questions will be accepted after this date/time. Questions will be answered via email in the form of an addendum to all potential proposers and posted on the website.

Post-Bid

Educational

$3,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
592
Active Projects
289
Bidding Soon
4,780
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2026

July 1, 2026

Project location map

Multiple Locations, Aurora, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.