Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 1, 2026 at 8:00 PM
Updated April 2, 2026
Site work for a water / sewer project in Ashland, New Hampshire. Completed plans call for site work for a water / sewer project.
The OWNER is upgrading its existing wastewater treatment facility. The project includes but is not limited to, the following (also see 01010 Summary of Work) Lagoon upgrades including new aeration systems, new baffle curtains within Lagoon Nos. 1 & 3, and new air lateral butterfly valves. Installation of new stop gates within the Lagoon Inlet Chamber and new automatic weir gates within the Lagoon Outlet Chamber. This requires concrete modifications within both structures. Installation of three (3) new positive displacement blowers, stainless steel air piping, heating and ventilation, electrical upgrades, and building improvements within the Blower Building. Installation of a new exterior standby generator. Installation of a below grade screening structure and tank to accept septage with mixing and pumping to the existing septage receiving unit within the Headworks Building. Sludge and Scum Vault upgrades including replacement of the access hatch and demolition of ceiling mounted heating and ventilation. Demolition of the covers and interior equipment within the existing two (2) 55-ft diameter secondary clarifiers. Installation of gravel fill within both abandoned clarifiers. Installation of a new UV disinfection system within a new concrete structure and building enclosure. Modification of yard piping to accommodate the new UV disinfection system. Installation of a new effluent flow meter and flood protection manhole Installation of a chemical dosing system within the Headworks Building. Installation of a flood protection manhole downstream of the new UV system. Installation of a new potable water line to the new UV structure. Installation of a new suction lift pump station and force main to accept flow at the revious West End Influent Structure and pump to the Headworks Building influent channel. Associated electrical and instrumentation upgrades. Question Deadline 03/20/2026 Technical questions must be forwarded to Underwood Engineers, Attn: David Mercier, P.E., President (dmercier@underwoodengineers.com). Telephone (603) 230-9898. Interpret the Contract Documents, drawings and specifications, by additions, deletions, clarifications or corrections. Such written or graphic instruments will be issued no less than five days before the bid opening. Wastewater Treatment Facility Upgrade. Electronic copies of the Contract Documents may be obtained from Underwood Engineers, Inc. upon email request. Partial sets will not be distributed. Paper copies will not be furnished.
Bid Results
Water / Sewer
$4,078,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
