Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Site work for a water / sewer project in Ashland, New Hampshire. Completed plans call for site work for a water / sewer project.

The OWNER is upgrading its existing wastewater treatment facility. The project includes but is not limited to, the following (also see 01010 Summary of Work) Lagoon upgrades including new aeration systems, new baffle curtains within Lagoon Nos. 1 & 3, and new air lateral butterfly valves. Installation of new stop gates within the Lagoon Inlet Chamber and new automatic weir gates within the Lagoon Outlet Chamber. This requires concrete modifications within both structures. Installation of three (3) new positive displacement blowers, stainless steel air piping, heating and ventilation, electrical upgrades, and building improvements within the Blower Building. Installation of a new exterior standby generator. Installation of a below grade screening structure and tank to accept septage with mixing and pumping to the existing septage receiving unit within the Headworks Building. Sludge and Scum Vault upgrades including replacement of the access hatch and demolition of ceiling mounted heating and ventilation. Demolition of the covers and interior equipment within the existing two (2) 55-ft diameter secondary clarifiers. Installation of gravel fill within both abandoned clarifiers. Installation of a new UV disinfection system within a new concrete structure and building enclosure. Modification of yard piping to accommodate the new UV disinfection system. Installation of a new effluent flow meter and flood protection manhole Installation of a chemical dosing system within the Headworks Building. Installation of a flood protection manhole downstream of the new UV system. Installation of a new potable water line to the new UV structure. Installation of a new suction lift pump station and force main to accept flow at the revious West End Influent Structure and pump to the Headworks Building influent channel. Associated electrical and instrumentation upgrades. Question Deadline 03/20/2026 Technical questions must be forwarded to Underwood Engineers, Attn: David Mercier, P.E., President (dmercier@underwoodengineers.com). Telephone (603) 230-9898. Interpret the Contract Documents, drawings and specifications, by additions, deletions, clarifications or corrections. Such written or graphic instruments will be issued no less than five days before the bid opening. Wastewater Treatment Facility Upgrade. Electronic copies of the Contract Documents may be obtained from Underwood Engineers, Inc. upon email request. Partial sets will not be distributed. Paper copies will not be furnished.

Bid Results

Water / Sewer

$4,078,000.00

Public - City

Site Work

80

19

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
69
Bidding Soon
1,602
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

May 25, 2026

Project location map

137 Collins St, Ashland, NH

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed