BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work for a water / sewer project in Beaver Dam, Wisconsin. Completed plans call for site work for a water / sewer project.

Replacement of approximately 70 iron or lead pipe water services and approximately 70 clay pipe sanitary laterals from the basement of the house to either the street terrace area or the main; as well as related work including unclassified excavation, site restoration, erosion control, and traffic control. Pre-qualification is required. Qualifications are due by 4:00 p.m. on March 4, 2026. Pre-qualification forms specific to this project are available for download from the QuestCDN project page under Q&A. Completed forms should be submitted by email only. Contractors will be notified of qualification status by 4:00 pm. on March 6, 2026. Direct all bidding inquiries to Engineer's Project Manager, Nate Rego, at (920) 392-5135. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: MSA Professional Services, Inc; Jason Laue, P.E; (920) 392-5136, jlaue@msa-ps.com, and Quest # 10075332 if Q&A is applicable for project. Questions received less than seven days prior to the date for opening of Bids may not be answered A. In general, the work consists of replacement of sanitary sewer laterals, water services, site restoration and all related work. Replacement can be either public (main to the edge of pavement for sanitary and main to the curb stop for water), private (edge of pavement to inside of building for sanitary and curb stop to inside of building for water), or both. B. The addresses of the properties and the anticipated work to be performed at each property (water service and/or sanitary lateral replacement) will be provided by the City of Beaver Dam staff. Contract A will include properties on Madison Street from Chatham Street to Rowell Street. Contract B will include properties on E 3 rd Street and E Maple Avenue from N Spring Street to University Avenue. C. The construction consists of supplying all materials, equipment, labor, etc. to supply a complete working system. D. Substantial Completion (including restoration) shall mean the successful installation and completion of all bid items to provide owner with a complete project, and may exclude the following. 1. Any items deemed non-essential by the Engineer and which the Contractor makes a written request for consideration by Engineer prior to the date of substantial completion and engineer affirms in writing. E. Final Completion (All Work) shall mean the successful completion of all work. This shall include the delivery (by Contractor to Owner) of all project closeout documentation, which includes in part the following. 1. Completed original lien waivers from the general contractor as well as from all sub-contractors and suppliers. 2. Final payment request and change order documentation (if applicable). 3. Any other documentation required by the contract documents. Bid Results CONTRACT A: MADISON ST (CHATHAM ST TO ROWELL ST) - Scott Lamers Costuction LLC - $382,520.23 CONTRACT B: E 3RD ST (N SPRING ST TO N UNIVERSITY AVE - Scott Lamers Costuction LLC - $662,342.30

Bid Results

Water / Sewer

$1,044,863.00

Public - City

Site Work

7

15

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

May 11, 2026

Project location map

Multiple Locations, Beaver Dam, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.