Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 24, 2026 at 8:00 PM
Updated March 25, 2026
Renovation of a clubhouse / community center in Miami Gardens, Florida. Completed plans call for the renovation of a clubhouse / community center.
Contractor shall review all documents, specifications, plans, and scope of work provided by Miami-Dade County Parks, Recreation, and Open Spaces Department for the work to be completed. Furnish all labor, equipment, and materials required to comply with the intent of the work described in the contract documents including but not limited to: complete replacement of all exterior aluminum impact windows and doors at the Country Club of Miami Clubhouse and Cart Storage Buildings. New aluminum impact resistant windows must have Miami Dade County NOA or Florida Product Approval to meet Miami Dade County Building Code Requirements. Contractor must obtain and submit all permits prior to performing any work and adhere to manufacturer's requirements and installation guidelines. Responsibilities include providing all necessary supervision, labor, tools, materials, and safety equipment, as well as any drawings (shop drawings, engineering, calculations, as-builts, sketches), documents and reports required by the building department for permitting, product specifications and approvals, permitting and inspection fees, written warranties (minimum 1 year on labor), closeout documents, and any additional documentation anticipated for permitting and performance. Contractor is to submit shop drawings at the pre-construction meeting, order materials once submittals are approved, and provide written delivery date confirmations bi-weekly. All required drawings, shop drawings, specifications, reports, and plans for permitting must be included as reflected by owner's drawings. Product approval and manufacturer specifications are to be submitted at the pre-construction meeting. Prime contractor must be a General Building Contractor or Glass/Glazing with at least two comparable completed projects; subcontractors must have Glass/Glazing experience. Question Deadline 03/13/2026 All Requests for Information (RFI) must be submitted electronically, in word format to Roberto.Ciprian@miamidade.gov and a copy filed with the Clerk of the Board at clerkbcc@miamidade.gov
Post-Bid
Clubhouse / Community Centers
$260,990.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2026
April 20, 2026
6801 NW 186th St, Miami Gardens, FL
Related To This Project
Miami Gardens, FL
Bid Date: Apr 03 2026
Miami Gardens, FL
--
Miami Gardens, FL
Bid Date: Mar 04 2026
Miami Gardens, FL
Bid Date: Apr 03 2026
Miami Gardens, FL
Bid Date: Mar 05 2026
Miami Gardens, FL
Bid Date: Feb 26 2026
Miami Gardens, FL
Bid Date: Feb 23 2026
Miami Gardens, FL
Bid Date: Jan 23 2026
Miami Gardens, FL
Bid Date: Jan 21 2026
Miami Gardens, FL
Bid Date: Jan 05 2026
Miami Gardens, FL
Bid Date: Oct 28 2025
Miami Gardens, FL
--
Miami Gardens, FL
--
Miami Gardens, FL
Bid Date: Oct 30 2025
Miami Gardens, FL
Bid Date: Oct 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
