BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2026 at 7:00 PM

Updated March 24, 2026

Site work for a playground / park / athletic field in Saint George, Utah. Completed plans call for site work for a playground / park / athletic field.

Washington County of Utah, in partnership with the Dixie National Forest; Pine Valley Ranger District, seeks to obtain proposals from qualified industry experts that can provide construction services in compliance with industry standards. The selected contractor will construct a Trailhead, designed by the Dixie National Forest, as well as perform light clearing and grubbing of an event parking, staging, and camping area for the Cliffrose Trail system. Responses to the RFP must be submitted in one electronic and two physical copies. Each proposal will be reviewed and scored according to the Selection Criteria contained in this RFP. A proposal is anticipated to be selected by March 25, 2026. Questions or comments shall be directed to: Leslie Fonger (leslie.fonger@washco.utah.gov) Cliffrose Trailhead and Event Area Construction o Project Management description o Project Collaboration plan o Trailhead Construction to include the following (not an exhaustive list): o Grubbing and clearing o Crushed aggregate base o concrete curb stops o Fencing o Concrete work o Shade structures o Kiosk and additional signage o Bike repair station o CXT Restroom (Comfort station) concrete apron and hole excavation o Event Area Construction to include the following (not an exhaustive list): o Light grubbing and clearing Removal of impediments to the parking of vehicles such as large rocks that protrude higher than 4 inches above the ground, woody shrubs, etc. Full clearing and removal of vegetation is not desired. o Create good ingress and egress points from the event area onto FS road 901 o Event area will be flagged by the Forest Service ahead of construction o Trailhead Construction will occur according to the attached design, specifications and descriptions provided by the Dixie National Forest

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - County

Site Work

14

4

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2026

April 22, 2026

Project location map

To be determined, Saint George, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.