Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 1, 2026 at 8:00 PM

Updated June 10, 2026

Site work for a bridge / tunnel in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel.

This Work includes the supply of all labour, materials, equipment and services required to complete the replacement of B057 (Fulton Creek). The Work includes, but is not limited to the following: Mobilization and Demobilization Road Closure Traffic Accommodation Environmental Construction Operation (ECO) Plan Demolition and Disposal of Bridge Structure Excavation - Structural Supply, Assembly and Installation of 22m of Precast Box Culvert (2,440 mm x 1,220 mm) Backfill - Crushed Granular Backfill - Non-Granular Heavy Rock Riprap (Class 1) Pavement and Concrete Removal - Asphalt Course Supply Gravel to Jobsite - Gravel 3-20 Base Non-Woven Geotextile Filter Fabric (Type A) Asphalt Surface - 50 mm Thick (10 mm-HT, PG 58-28) Asphalt Base - 250 mm Thick (20 mm-B, PG 58-28) Guardrail - Supply, Fabrication, Delivery and Installation Miscellaneous Iron Erosion Control Barrier (Straw Fibre Roll) Erosion Control Soil Covering - Supply and Install (Type B) Seeding Total Suspended Solids (TSS) Testing - Deletable Fish Capture and Release - Deletable Documents can be obtained from https://tinyurl.com/5dvpu74b

Award

Bridges / Tunnels

$796,205.00

Public - City

Site Work

10

6

16

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
28
Bidding Soon
541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

April 1, 2026

Project location map

34th St, Edmonton, AB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed