BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated April 1, 2026

Site work for a bridge / tunnel in Edmonton, Alberta. Completed plans call for site work for a bridge / tunnel.

This Work includes the supply of all labour, materials, equipment and services required to complete the replacement of B057 (Fulton Creek). The Work includes, but is not limited to the following: Mobilization and Demobilization Road Closure Traffic Accommodation Environmental Construction Operation (ECO) Plan Demolition and Disposal of Bridge Structure Excavation - Structural Supply, Assembly and Installation of 22m of Precast Box Culvert (2,440 mm x 1,220 mm) Backfill - Crushed Granular Backfill - Non-Granular Heavy Rock Riprap (Class 1) Pavement and Concrete Removal - Asphalt Course Supply Gravel to Jobsite - Gravel 3-20 Base Non-Woven Geotextile Filter Fabric (Type A) Asphalt Surface - 50 mm Thick (10 mm-HT, PG 58-28) Asphalt Base - 250 mm Thick (20 mm-B, PG 58-28) Guardrail - Supply, Fabrication, Delivery and Installation Miscellaneous Iron Erosion Control Barrier (Straw Fibre Roll) Erosion Control Soil Covering - Supply and Install (Type B) Seeding Total Suspended Solids (TSS) Testing - Deletable Fish Capture and Release - Deletable Pre-Bid Meeting 03/10/2026 at 11:00 AM MT Documents can be obtained from https://tinyurl.com/5dvpu74b

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - City

Site Work

10

6

16

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
0
Bidding Soon
342
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

April 1, 2026

Project location map

34th St, Edmonton, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.