Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2026 at 8:00 PM
Updated March 19, 2026
Site work for a development in Prineville, Oregon. Completed plans call for site work for a development.
Tree planting and seedling protection services for conifers and native riparian hardwoods during the spring and fall of 2026, including furnishing all supplies, equipment, tools, labor, supervision, transportation, and incidentals required to complete the work as specified. Work includes transporting Government-Furnished Property from storage locations to project sites, providing containers for water transport and seedling dipping, and supplying a refrigerated truck or trailer meeting the specifications in the Statement of Work. Approximately 500,000 seedlings will be planted in spring 2026 across multiple project areas within the Paulina and Lookout Mountain Ranger Districts, including areas burned in the 2024 Crazy Creek, Rail Ridge, and Wiley Flat fires, as well as the Lake Project Area near Walton Lake. Planting includes multiple stock types such as 1-0 bareroot, 2-0 bareroot, and containerized seedlings, with conifer stock consisting of roughly 95 percent ponderosa pine and 5 percent western larch. Riparian species include multiple native hardwoods and vegetation. The scope also includes installing Government-Furnished seedling protections such as shade wickets, flex netting, and rigid mesh tubing as optional items. Multiple planting crews and performance breaks may be required to meet acceptable planting conditions and seedling protection requirements. All work shall comply with licensing and certification requirements for Labor Intensive Service Contract work, including MSPA, BOLI, and H2B documentation as applicable. The period of performance extends from the date of award through December 31, 2026. Location: Ochoco National Forest and Crooked River National Grassland Office, 3160 NE Third Street, Prineville, OR 97754. Question Deadline 03/13/2026 Questions shall be submitted via email to paula.winningham@usda.gov are due no later than three days prior to quote due date and time
Post-Bid
Conservation and Development
$10,000,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
May 18, 2026
3160 NE 3rd St, Prineville, OR
Related To This Project
Prineville, OR
Bid Date: Mar 27 2026
Prineville, OR
Bid Date: Mar 31 2026
Prineville, OR
Bid Date: Mar 10 2026
Prineville, OR
Bid Date: Feb 24 2026
Prineville, OR
Bid Date: Jan 20 2026
Prineville, OR
Bid Date: Sep 25 2025
Prineville, OR
Bid Date: Sep 11 2025
Prineville, OR
Bid Date: Aug 19 2025
Prineville, OR
Bid Date: Aug 12 2025
Prineville, OR
Bid Date: Aug 04 2025
Prineville, OR
Bid Date: Aug 14 2025
Prineville, OR
Bid Date: Jun 29 2025
Prineville, OR
Bid Date: Jun 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
