Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2026 at 8:00 PM
Updated March 28, 2026
Site work for a bridge / tunnel in Raleigh, North Carolina. Completed plans call for site work for a bridge / tunnel.
The Work of Project is defined by the Contract Documents and consists of the following Beaver Creek Bridge: Remove and replace the existing composite top rail (approx. 250 LF) along the existing bridge rails. Install new Marine Grade PT 2x10 top rail (approx. 250 LF) as detailed in the plans. Remove and replace posts and bottom rails as shown on the plans per unit pricing. Existing continuous composite rub rail (approx. 250 LF) will be removed and replaced with the same Marine Grade PT 2x10 under the alternate. Reedy Branch Bridge: Remove and replace the existing composite top rail (approx. 232 LF) along the existing bridge rails. Install new Marine Grade PT 2x10 top rail (approx. 232 LF) as detailed in the plans. Remove and replace posts and bottom rails as shown on the plans per unit pricing. Existing continuous composite rub rail (approx. 232 LF) will be removed and replaced with the same Marine Grade PT 2x10 under the alternate. White Oak Creek Bridge: Remove and replace the existing composite top rail (approx. 326 LF) along the existing bridge rails. Install new Marine Grade PT 2x10 top rail (approx. 326 LF) as detailed in the plans. Remove and replace posts and bottom rails as shown on the plans per unit pricing. Existing continuous composite rub rail (approx. 326 LF) will be removed and replaced with the same Marine Grade PT 2x10 under the alternate. B. Type of Contract: 1. Project will be constructed under a single prime contract. Provide labor, material, and equipment for the construction of the 'American Tobacco Trail Bridge Rail Repairs', located along the western side of Wake County. Bidders must comply with the requirements of the Wake County Minority Business Enterprise Program. The Owner reserves the right to reject any or all bids and to waive informalities. No bid may be withdrawn for sixty days after the scheduled closing time for bids.
Post-Bid
Bridges / Tunnels
$500,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2026
April 27, 2026
Multiple Locations, Raleigh, NC
Related To This Project
Raleigh, NC
Bid Date: Mar 09 2026
Raleigh, NC
Bid Date: Apr 01 2026
Raleigh, NC
Bid Date: Mar 24 2026
Raleigh, NC
Bid Date: Mar 03 2026
Raleigh, NC
Bid Date: Mar 26 2026
Raleigh, NC
Bid Date: Mar 31 2026
Raleigh, NC
Bid Date: Mar 05 2026
Raleigh, NC
Bid Date: Mar 19 2026
Raleigh, NC
Bid Date: Mar 19 2026
Raleigh, NC
Bid Date: Apr 01 2026
Raleigh, NC
Bid Date: Mar 25 2026
Raleigh, NC
--
Raleigh, NC
--
Raleigh, NC
Bid Date: Mar 26 2026
Raleigh, NC
Bid Date: Mar 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
