Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 26, 2026 at 8:00 PM
Updated May 27, 2026
Site work and new construction of a water / sewer project in Bellingham, Washington. Completed plans call for the construction of a 5,000-square-foot water / sewer project; and for site work for a water / sewer project.
The Project at the City of Bellingham's (City's) Post Point Wastewater Treatment Plant (PPWWTP) is a comprehensive initiative aimed at modernizing the air pollution control (APC) equipment for both of the plant's multiple hearth incinerators to meet the emission standards outlined in 40 Code of Federal Regulations Part 60, Subpart LLLL. The PPWWTP operates two multiple hearth incinerators to reduce wastewater biosolids to inert ash and flue gas. Incinerator flue gas emissions are regulated through the Clean Air and Clean Water Acts and permitted by the Northwest Clean Air Agency, a regional regulatory body delegated by the Environmental Protection Agency. Question Deadline 04/07/2026 Questions from Proposers must be received by the Owner The PPWWTP incinerators are permitted to meet emission standards established in Title 40 of the Code of Federal Regulations Part 62, Subpart LLL. Through a technical evaluation and alternatives analysis completed in March 2025, the City elected to upgrade the multiple hearth incinerator APC equipment to meet the more stringent emission limits established by Title 40 Code of Federal Regulations Part 60, Subpart LLLL. This work is driven by the City's commitment to maintaining environmental stewardship, modernizing the incineration system to ensure protection of public health, and maintaining uninterrupted, safe, and compliant operations at PPWWTP. These drivers serve as the basis for achieving the Project goal of lowering PPWWTP emissions to within LLLL standards. Early design efforts have determined that the upgrades will include installing a new wet scrubber, wet electrostatic precipitator, regenerative thermal oxidizer, selective catalytic reduction, and mercury control unit. To accommodate this equipment, the Project will include the construction of a new APC equipment building north of the existing solids handing buildings. Conceptual design has established that this building will be approximately 5,000 square feet and will house the selected APC equipment, a new electrical room, incinerator control room, and supporting process mechanical systems such as induction fans and process water pumps. The City is electing to approach the APC equipment design using performance-based specifications to receive a vendor-provided performance guarantee that the newly installed equipment will meet LLLL emissions standards. Pursuant to RCW 39.10, Alternative Public Works Contracting Procedures, the Owner intends to award a contract for GC/CM services utilizing a two-step competitive process to select the most qualified contractor. Contact Information: The City of Bellingham Purchasing Office will act as the sole point of contact for this RFP and will administer the RFP process. The City of Bellingham in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin or sex in consideration for an award. ** pre bid info : A virtual option utilizing Microsoft Teams (MS Teams) for the Pre-Proposal Meeting will be available for those Proposer's unable to attend in-person. A virtual option, however, will not be available for the site tour. Construction Notice to Proceed a September 2027 Project completion a December 2030 Shortlist confirmed
Post-Bid
Water / Sewer
$15,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2026
September 1, 2027
200 McKenzie Ave, Bellingham, WA
Related To This Project
Bellingham, WA
Bid Date: Apr 02 2026
Bellingham, WA
Bid Date: Mar 24 2026
Bellingham, WA
--
Bellingham, WA
Bid Date: Mar 31 2026
Bellingham, WA
Bid Date: Mar 24 2026
Bellingham, WA
Bid Date: Mar 31 2026
Bellingham, WA
Bid Date: Mar 27 2026
Bellingham, WA
Bid Date: Mar 31 2026
Bellingham, WA
Bid Date: Mar 24 2026
Bellingham, WA
Bid Date: Mar 09 2026
Bellingham, WA
Bid Date: Mar 12 2026
Bellingham, WA
Bid Date: Mar 12 2026
Bellingham, WA
Bid Date: Mar 05 2026
Bellingham, WA
--
Bellingham, WA
Bid Date: Mar 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
