This is a service / maintenance or supply contract in Marion, Illinois. Contact the soliciting agency for additional information.
Update of existing electrical infrastructure at the United States Penitentiary Marion, including replacement of unit substations in Vaults 1 through 5 with new outdoor, pad-mounted substations and extension of primary circuitry from existing vacuum loop switchgear except for Substation 4. All electrical equipment in Vault 4 will be demolished, with new substation equipment incorporating primary switchgear to replace the loop switch functionality. Required existing panelboards from Vault 4 will be replaced in new locations, and existing primary loop fault indicators will be salvaged, reinstalled, and re-wired. Structural repairs will be completed at Vault 4, all openings sealed, and the vault backfilled. The existing transformer and switchboard that feed the "Old Camp" will be demolished and replaced with a new outdoor, pad-mounted substation, with primary cables spliced in the existing transformer structure and extended. Primary circuitry serving the "Training Center" will be re-fed from a new switch incorporated into the substation. Each new unit substation will provide metering at low-voltage main and feeder breakers, integrated with the facility management system via new wiring for data display and recording. Feeder circuits downstream of Substations 1 through 6 will be replaced, and deteriorated or under-rated panelboards will be replaced with new equipment. Flush-mounted panelboard boxes will be extended for new conduit connections, and wiring will be spliced or extended as needed. Panelboards not scheduled for replacement will receive new dedicated equipment ground buses, with re-termination of neutrals and grounds as required. Branch circuitry and wiring devices serving kitchen and laundry equipment in the penitentiary and "Old Camp" areas will be replaced. Selected deteriorated motor starters in the Powerhouse will be replaced with new starters of similar functionality. See the Statement of Work and specifications for full project requirements. Location: United States Penitentiary (USP) Marion, 4500 Prison Rd, Marion, IL 62959. The Method of Contractor Selection has not been determined at this Time.
Conceptual
Military
$10,000,000.00
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 14, 2026
4500 Prison Rd, Marion, IL
Related To This Project
Marion, IL
Bid Date: Mar 26 2026
Marion, IL
Bid Date: Feb 20 2026
Marion, IL
Bid Date: Mar 12 2026
Marion, IL
Bid Date: Feb 12 2026
Marion, IL
Bid Date: Feb 04 2026
Marion, IL
Bid Date: Feb 12 2026
Marion, IL
Bid Date: Feb 06 2026
Marion, IL
Bid Date: Jan 26 2026
Marion, IL
Bid Date: Feb 04 2026
Marion, IL
Bid Date: Feb 03 2026
Marion, IL
Bid Date: Jan 28 2026
Marion, IL
Bid Date: Feb 27 2026
Marion, IL
Bid Date: Dec 07 2025
Marion, IL
--
Marion, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.