Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a mixed-use development in Fond du Lac, Wisconsin. Completed plans call for site work for a water / sewer project; and sidewalk / parking lot.

The work to be completed under this contract consists of street and utility construction including sanitary sewer main and laterals, water main and services, storm sewer main and laterals, curb and gutter, pavement, lawn restoration, and any other items necessary to complete the work as shown on the plans and contract documents. The following list indicates the limits of construction End of Hidden Valley Circle to proposed dead end of Hidden Valley Circle incorporating a proposed cul de sac, Hidden Valley Court - new construction The bid quantities listed include an alternative for a potential extension of Hidden Valley Circle from the intersection of Hidden Valley Circle and Hidden Valley Court/Lane. This alternative includes asphalt pavement surface and associated depth of crushed aggregate base course, curb and gutter, and water main and its related appurtenances as well as any other items necessary to complete work as shown on the plans and contract documents. 750 LF 8-inch and 6-inch sanitary sewer main and laterals, 950 LF 30-inch to 6-inch storm sewer main and laterals, 810 LF 8-inch and 6-inch water main, 360 LF polyethylene water service pipe, 140 SF 4-inch concrete sidewalk, 1,740 LF concrete curb and gutter, 7,400 SY lawn restoration, 7,400 CY common excavation, 3,710 SY crushed aggregate base course, 3,030 SY asphalt pavement. Categories include sewer and water construction, sitework excavating and grading, grubbing and clearing, landscaping (seeding), utility street construction and excavation, and paving (asphalt or concrete). Pre-qualification: Required

Award

Water / Sewer

$549,640.00

Public - City

Site Work

22

10

2

3

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
68
Bidding Soon
1,793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

April 30, 2026

Project location map

Multiple Locations, Fond du Lac, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed