Demolition, site work, paving and new construction of a bridge / tunnel in Syracuse, New York. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

BIN 3354600 The Owner is Otsego County and the work site is located in the Town ofHartwick. The projects limits extend from 200 ft. west ofthe existing bridge and 100 ft. east ofthe existing bridge. Reference Number 0000414701 Furnish Otsego County Route 59 Bridge Replacement as specified. Question Deadline 03/17/2026 at 4:00 PM ET Questions are submitted online No . Questions regarding the Contract Documents should be directed to James Craig, P.E., C&S Engineers, Inc. by telephone at (315) 703-4379. Bidders shall promptly notify James Craig, P.E. of any errors, omissions . General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Installation Required - Insurance Required - Local Service Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Instructions to Bidders. The work will be substantially completed within 200 calendar days from the Notice to Proceed or November 30, 2026, whichever comes first. Substantial completion shall mean the project is opened to traffic. Any punch list work shall be completed and final quantities shall be ready for final payment by December 30, 2026. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion ofthe work shown on the plans and described in these specifications including, but not necessarily limited to the following: removal of existing 112 ft. two span steel multi-girder structure, placement of a new 120 ft. single span steel multi-girder structure, new cast-in-place concrete integral abutments and wingwalls founded on steel h-piles, steel sheeting installations, stone fill placement, approach work, and guiderail installation. This is a BridgeNY (Federal Aid) Project and NYSDOT Standard Specifications, officially finalized and adopted on January 1, 2026 as posted on the New York State Department of Transportation's website must be followed by the successful bidder. Otsego County reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids. All bids are subject to final review and approval by the Otsego County Legislature before any award of contract may be made. Receipt of bids by Otsego County shall not be construed as authority to bind Otsego County. This is a unit price bid as described in the Instructions to Bidders. No bidder may withdraw his/her bid within forty-five (45) calendar days after the actual date of the opening thereof. The DBE goal for this project is: 0%. There are no M/WBE or SDVOB goals for this project. The EEO Employment goals for this project are: 2.5% Minority Employment Goal 6.9% Women Employment Goal Bids received via facsimile or e-mail will not be considered. Bid Proposals must be submitted as one original.

Post-Bid

Bridges / Tunnels

$800,000.00

Public - County

Demolition, New Construction, Paving, Site Work

123

15

4

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
4
Bidding Soon
947
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

April 23, 2026

Project location map

Otsego County Route 59, Syracuse, NY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.