BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 29, 2026 at 8:00 PM

Updated May 30, 2026

Site work and paving for a mixed-use development in Quinte West, Ontario. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

“The owner has selected a Design Builder. A timeline for construction has not yet been established.” The waterfront trail extension from Centennial Park to Bain Park in Trenton, ON, will create a new travel corridor for pedestrians and cyclists, connecting downtown to 8 Wing/CFB Trenton and providing access to both parks. The extension is approximately 1.7 km in length and will connect to the existing 2.5 km multi-use asphalt pathway. Work includes continuing the existing asphalt multi-use pathway and installing benches, signage, fencing, and landscaping. Additional provisional items are outlined. Required features include 1.7 km of asphalt multi-use pathway, 450 metres of fencing, 2 culverts, 10 bike racks, 20 benches, 140 trees/shrubs, 3 trailhead signs, an open-space pergola structure, pollinator gardens, and additional wayfinding trail signage. The municipality is open to other features that enhance design and user experience. The landscape design is to be completed by the selected contractor with the features outlined in the deliverables and in accordance with the City’s in-house engineering design of the multi-use asphalt path, including specifications for culverts and solar lighting. The design of the extension must integrate with the path design, including a 2.4m x 1.2m concrete culvert, two 525mm diameter CSP culverts, and solar lighting along the trail. The landscape design for this project is to be completed by the selected contractor with the features as outlined in the deliverables and in accordance with the City’s in-house engineering design of the multi-use asphalt path including specifications of the culverts and solar lighting. The funding being provided by the Government of Canada Active Transportation Fund has a substantial completion date of December 31, 2026. The preliminary design concept (30%) shall be completed by June 1, 2026 and the final design drawings and specifications shall be completed no later than July 31, 2026. Commencement of construction work will immediately follow the final approved design and with substantial completion on or before December 31, 2026 with final completion on or before May 1st, 2027.

Award

Sidewalks / Parking Lot

$3,070,000.00

Public - City

Paving, Site Work

9

5

111

5

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
165
Bidding Soon
1,543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2026

August 3, 2026

Project location map

8 Couch Crescent, Quinte West, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.