BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work and renovation of a water / sewer project in Pea Ridge, Arkansas. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

This project consists of rehabilitating the Hwy 72 elevated water storage tank, including: exterior surface preparation and re-surfacing, interior surface preparation and re-surfacing, replacing or modifying vents and hatches, installation of a tank roof handrail system, and an interior safety climb ladder system, concrete foundation cleaning, caulking and sealing, and painting of a logo. Bidders are instructed that a five percent (5%) bid bond shall be submitted with the bid proposal. Pea Ridge reserves the right to waive any formalities and to reject any or all bids.

Bid Results

Water / Sewer

$217,000.00

Public - City

Renovation, Site Work

7

8

4

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 16, 2026

Project location map

AR-72, Pea Ridge, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.