BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Stockton, California. Completed plans call for site work for a road / highway.

Provide professional consultant services to design intersection safety improvements at three intersections and provide assistance during the construction phase of the project: March Lane at Red Russo Drive, March Lane and Precissi Lane, and Hammer Lane and Montauban Avenue. Consultant must be familiar with the Highway Safety Improvement Program (HSIP), and Carbon Reduction Program Local (CRPL) funded projects, Caltrans Local Assistance Programs Guidelines (LAPG) and Local Assistance Procedures Manual (LAPM). The Consultant and Consultant Staff must demonstrate recent design experience on similar projects. Question Deadline 03/18/2026 Any question or request for clarification shall be submitted in writing to: Evan.Bannister@stocktonca.gov , Requests for clarification shall be submitted at least seven (7) business days prior to the proposal due date. The proposed project involves installing protected left-turn signal heads, larger signal lens, retro-reflective back-plates, high reflectivity lane and crosswalk markings, traffic video detection system, and Accessible Pedestrian Signals & near side signal heads at select locations.

Post-Bid

Roads / Highways

$3,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
527
Active Projects
298
Bidding Soon
3,849
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

June 5, 2026

Project location map

Multiple Locations, Stockton, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.