BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 7, 2026

Site work and paving for a road / highway in Lake City, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 02 Selection Method : Letter of Response and Interview Plain Language Description : This is a design advertisement for State Road 47 from Clay Hole Creek to State Road 25 (US 41) Southwest Main Boulevard; State Road 134 (103rd Street) from POW-MIA Memorial Parkway to West of Samaritan Way; Shortlist Selection Date/Time 3/30/2026 07:30 pm Consultant Interviews Date/Time 4/24/2026 Final Selection Date/Time 5/04/2026 07:30 pm Negotiations Period Begin Date 5/05/2026 Negotiations Period Ending Date 7/21/2026 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Design SR 47 Clay Hole Creek to SR 25 (US41)

Conceptual

Roads / Highways

$1,717,820.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
11
Bidding Soon
675
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2027

Project location map

FL-47, Lake City, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.