Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 14, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a road / highway in Valdosta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The contract time is 180 calendar days. A 5% bid bond is required. Old Valdosta Road - 1.92 Miles - 22 ' wide - Beginning at Coffee Road Ending at Cook County Line Bituminous tack coat before each lift Leveling 80lbs OGI o Topping 165lbs 12.5 mm Superpave o Pick up all shoulder clippings on entire road o Shoulder grading - See detail o Permanent grassing (Hydro - seed ) Temporary centerline stripe 4 " wide - once after leveling Temporary centerline and edge line stripe 4" wide - once after topping Permanent centerline and edge line stripe 5" wide - 15 days after topping RPMs King's Way - .33 Miles - 39 ' wide - Beginning at Old US 41 New Joint Ending at Camelot Crossing o Mill Asphaltic Concrete Pavement 1 1/2 inch Depth Topping 165lbs 12.5 mm Superpave Temporary centerline and edge line stripe 4 " wide - once after topping Permanent centerline and edge line stripe 5 wide (High Build ) - 15 days after topping o Adjust manholes to grade (if needed ) 8 Type 2 Arrows (Thermoplastic ) 1 Stop Bar ( 24 " Thermoplastic ) Camelot Crossing - .15 Miles - Beginning at State Route 7 Ending at Dead End o Regular Ga . Paint centerline and edge line stripe 5" wide 1 Stop Bar ( 24 " Thermoplastic ) Guest Road -1.48 Miles - Beginning at State Route 125 Ending at Bemiss Knights Academy Road Regular Ga . Paint centerline and edge line stripe 5" wide o 2 Stop Bar (24 " Thermoplastic ) o RPM's 2 RR crossings (Thermoplastic ) James Road 1.90 Miles - Beginning at State Route 38 Ending at Approx . 135 Feet past Valdosta City Limits at End of Concrete Median o Regular Ga . Paint centerline and edge line stripe 5" wide o Stop Bars (24 " Thermoplastic ) o Arrows (Thermoplastic ) o RPM's o White & Yellow gore striping
Post-Bid
Roads / Highways
$3,000,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2026
June 22, 2026
Multiple Locations, Valdosta, GA
Related To This Project
Valdosta, GA
--
Valdosta, GA
Bid Date: Apr 23 2026
Valdosta, GA
Bid Date: May 21 2026
Valdosta, GA
Bid Date: Apr 28 2026
Valdosta, GA
Bid Date: Apr 28 2026
Valdosta, GA
Bid Date: May 07 2026
Valdosta, GA
Bid Date: May 05 2026
Valdosta, GA
Bid Date: May 21 2026
Valdosta, GA
Bid Date: Mar 12 2026
Valdosta, GA
Bid Date: Mar 12 2026
Valdosta, GA
Bid Date: Feb 24 2026
Valdosta, GA
Bid Date: Mar 24 2026
Valdosta, GA
Bid Date: Mar 19 2026
Valdosta, GA
Bid Date: Mar 09 2026
Valdosta, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
