BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a road / highway in Valdosta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The contract time is 180 calendar days. A 5% bid bond is required. Old Valdosta Road - 1.92 Miles - 22 ' wide - Beginning at Coffee Road Ending at Cook County Line Bituminous tack coat before each lift Leveling 80lbs OGI o Topping 165lbs 12.5 mm Superpave o Pick up all shoulder clippings on entire road o Shoulder grading - See detail o Permanent grassing (Hydro - seed ) Temporary centerline stripe 4 " wide - once after leveling Temporary centerline and edge line stripe 4" wide - once after topping Permanent centerline and edge line stripe 5" wide - 15 days after topping RPMs King's Way - .33 Miles - 39 ' wide - Beginning at Old US 41 New Joint Ending at Camelot Crossing o Mill Asphaltic Concrete Pavement 1 1/2 inch Depth Topping 165lbs 12.5 mm Superpave Temporary centerline and edge line stripe 4 " wide - once after topping Permanent centerline and edge line stripe 5 wide (High Build ) - 15 days after topping o Adjust manholes to grade (if needed ) 8 Type 2 Arrows (Thermoplastic ) 1 Stop Bar ( 24 " Thermoplastic ) Camelot Crossing - .15 Miles - Beginning at State Route 7 Ending at Dead End o Regular Ga . Paint centerline and edge line stripe 5" wide 1 Stop Bar ( 24 " Thermoplastic ) Guest Road -1.48 Miles - Beginning at State Route 125 Ending at Bemiss Knights Academy Road Regular Ga . Paint centerline and edge line stripe 5" wide o 2 Stop Bar (24 " Thermoplastic ) o RPM's 2 RR crossings (Thermoplastic ) James Road 1.90 Miles - Beginning at State Route 38 Ending at Approx . 135 Feet past Valdosta City Limits at End of Concrete Median o Regular Ga . Paint centerline and edge line stripe 5" wide o Stop Bars (24 " Thermoplastic ) o Arrows (Thermoplastic ) o RPM's o White & Yellow gore striping

Post-Bid

Roads / Highways

$3,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
55
Bidding Soon
681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

June 22, 2026

Project location map

Multiple Locations, Valdosta, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.