BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2026 at 7:00 PM

Updated March 20, 2026

Site work and paving for a sidewalk / parking lot in Stony Point, New York. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The proposed project consists of the replacement of various sections of curbing and sidewalks along the Route 9W corridor beginning from the municipal boundary south of Holt Drive and extending North to Rose Street. The replacement shall include the removal and replacement of concrete sidewalks and curbing, in kind, as outlined within the bid document and plans. The work shall also include ADA accessible ramps and crosswalk striping, as described in the bid documents. Bidders are required to obtain contract documents from the specified engineering office, either in person for a deposit or electronically at no charge. Each bid must be accompanied by a bid guarantee of at least five percent of the bid amount, payable to the Town as a guarantee that the bidder will execute the contract and file acceptable performance and payment bonds and insurance certificates within ten days after award. Bids will only be accepted from those whose names and addresses are on record as having obtained the contract documents. The Town reserves the right to reject any or all bids and to waive any formality or technicality in the interest of the Owner. Bidders are required to execute non-collusion bidding certificates and comply with labor standards, minimum wage rates, employment conditions, and all applicable equal opportunity and anti-discrimination provisions. Additional certifications and information regarding bidder qualifications, experience, and financial status must also be provided as part of the bid submission. The contractor must guarantee work for one year after final acceptance and comply with all insurance and bonding requirements, with specified coverage types and amounts. The project must be completed within 120 days, with liquidated damages specified for delays beyond that period. All federal, state, and local laws and regulations apply. All inquiries in reference to the technical issues shall be directed to: Lane & Tully Engineering and Surveying, D.P.C. (845) 294-3700. Question Deadline 03/12/2026 No interpretations ofthe meaning ofthe drawings, specifications or others pre-bid documents will be made orally to any bidder. Every request for such interpretation should be in writing addressed to the attention of John Queenan, Town Engineer, Town ofStony Point, Email: jq@lanctully.com, and to be given consideration must be received at least five (5) working days prior to the date fixed for the opening of bids.

Post-Bid

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

5

14

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
42
Bidding Soon
4,581
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

April 20, 2026

Project location map

To be determined, Stony Point, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.