BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 27, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a civil project in Sumner, Washington. Completed plans call for site work for a road / highway; and water / sewer project.

The project consists of full width reconstruction of Washington Street from Wood Avenue to approximately 75 feet beyond McMillan Ave and consists of: Roadway: work includes full reconstruction of the roadway section with cement treated base, curb and gutter, planter strip, sidewalks, ADA ramps and driveways. This project also includes partial reconstruction of Wood Avenue to accommodate new utility crossings and improvements to Wood Avenue ADA improvements. This includes an alternative bid for restoration of planter strips with either new top soil or fertilizer amended in place. Utilities: Replace 6" asbestos concrete watermain, replacement of 8" sanitary sewer main, and new storm system. Completed bid proposals should be delivered to City of Sumner - City Hall, 1104 Maple Street, Sumner, WA 98390. The Engineer's estimated range for this project is between $1,700,000 and $2,100,000. Question Deadline 03/24/2026 at 12:00 PM PT For questions, please contact Gursimran Singh, Engineering Specialist, at 253.299.5712 or bids@sumnerwa.gov.

Bid Results

Roads / Highways

$1,730,694.00

Public - City

Paving, Site Work

46

13

2

6

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

June 1, 2026

Project location map

Washington St, Sumner, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.