BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work for a water / sewer project in Norfolk, Virginia. Conceptual plans call for site work for a water / sewer project.

03/24/2026 UPDATE: Final Industry Day Slides, Q&A Session, and Industry Day Attendance added as attachments to this posting. Please be advised: This single industry day will cover two separate and distinct projects, which will be solicited independently: the NASA Wallops Breakwater Project and the NASA Wallops Beach Renourishment Project. Construction of two to four breakwaters along the beach at Wallops Island, placed approximately 200 feet offshore on 12-inch-thick marine mattress with geotextile fabric. Each breakwater will consist of approximately 10,000 tons of Type II riprap armor stone and VDOT Class III core stone, placed in water depths ranging from -9.5 feet to -12 feet NAVD88 and built to a crest height of +7 feet NAVD88. Work may be performed and materials transported by land or sea. Construction activities will be subject to restrictions related to active rocket launches requiring temporary site evacuation. The work includes all associated construction activities required for full installation and completion in accordance with project plans and specifications. estimated construction price range for this project is between $25,000,000 and $100,000,000. Beach nourishment at Wallops Island using hopper dredge equipment, with dredging occurring within Unnamed Shoal A to a maximum depth of seven feet below existing bottom. Existing bottom depths within the borrow area range from -34 feet NAVD88 to -60 feet NAVD88. Dredged material will be transported approximately eleven miles to the placement site and discharged by hydraulic pump-off along the beach. The work includes grading the nourished beach to required elevations and dimensions, conducting pre- and post-placement hydrographic surveys, managing dredging and placement operations, and coordinating with maritime users to reduce impacts to vessel traffic, adjacent structures, and concurrent dredging activities. The estimated required pay volume is between 1,500,000 and 2,500,000 cubic yards of material retained on the beach. Estimated construction price range for this project is between $25,000,000 and $100,000,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$100,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
1
Bidding Soon
665
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2027

Project location map

Multiple Locations, Norfolk, VA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.