Published May 7, 2026 at 8:00 PM

Updated May 20, 2026

Demolition and site work for a residential development in Jackson, Michigan. Completed plans call for the demolition of a residential development; and for site work for a residential development.

The work includes demolition of house at 567 Cooper St. Bidders may obtain Instructions to Bidders, Proposal Forms, Specifications, and Contract Forms via the City of Jackson e-Procurement Portal. Pre-qualification requirements: Bidders will be required to meet the City of Jackson's pre-qualification requirements prior to bid opening. Bidders must be prequalified for completed registration on SAM.gov. Completion Date: June 12, 2026 The successful Contractor will be responsible for providing the following services for each Property included in this project: 1. Abatement of asbestos indicated in the attached Asbestos Containing Material and Hazardous Materials Inspection Report by a licensed asbestos abatement contractor in accordance with state and federal regulations prior to demolition. a. The demolition contractor is strictly prohibited from beginning demolition of the structure prior to receiving clearance to proceed from the City. The City has hired an independent contractor to conduct hazardous material clearance inspections in order to verify that all hazardous materials have been abated prior to demolition. The demolition contractor must provide an air monitoring report and notify the City when all hazardous material has been abated. There will be a $5,000.00 fine for beginning demolition of the structure prior to the hazardous material clearance inspection and authorization to proceed with the demolition from the City. The contractor will not be paid for the demolition of any structure if they begin demolition of the structure prior to the hazardous material clearance inspection and authorization to proceed with the demolition from the City. 2. Provide the requisite environmental insurance that will cover the Contra ctor, its subcontractors, and the City from any claim arising out of the abatement and demolition process in addition to other required insurance required in this IFQ. If the Contractor has subcontracted the work to a licensed asbestos abatement firm, the subcontractor's insurance may meet this requirement. 3. Demolition of all structure(s) and abatement of hazardous materials shall be in accordance with the following: 4. Prior to commencing abatement provide the following: a. Submit for the City's approval a project schedule for the abatement of hazardous materials, completion of the demolition and all special conditions, and site restorations as required by this Agreement. This schedule shall include allowances for periods of time required for the City's review. Time limits established in the schedule approved by the City shall not be exceeded by the Contractor. b. 10-day Michigan Department of Environmental Quality (DEQ)/National Emissions Standards for Hazardous Air Pollutants (NESHAP) notice to abate. c. 10-day Michigan Department of Licensing and Regulatory Affairs (LARA) (Michigan Occupational Safety and Health Administration (MIOSHA) notice to abate. d. Provide revised notifications if applicable. e. Obtain abatement permit from the Department of Community Development. 5. Prior to commencing demolition, the Contractor shall: a. Abate hazardous materials identified in the attached assessment reports for each structure in accordance with local, state, and federal regulations. b. Provide air monitoring report for all abatement activity. Dates must match the appropriate LARA (MIOSHA) abatement notification dates. c. Provide a Non-Hazardous Special Waste and Asbestos Manifest for disposal of hazardous material in an approved Type II landfill (see attached example). d. Request Visual Clearance inspection from the Department of Community Development. e. Provide 10-day DEQ notice to demolish. f. Provide revised 10-day DEQ notice to demolish if applicable. g. Arrange for proper abandonment of all utility services. Contact Miss Dig prior to demolition. h. Submit a completed demolition permit application. i. Verify existing condition of streets, sidewalks, curbs, fences, and other infrastructure and site improvements with the Department of Community Development and provide photographs of all damages that exist prior to mobilizing equipment on-site. j. Install storm water inlet filters on storm drain inlets at the demolition site and the first two (2) storm drain inlets downstream of the demolition site or as directed by the Department of Community Development. k. Coordinate the closure of any public street with the Department of Public Works. l. Install safety measures to limit access to the demolition. m. Install soil erosion control measures as site conditions warrant. 6. During Demolition: a. Request a pre-demolition inspector prior to commencing demolition activities. b. Water down all attic areas containing insulation prior to demolition and water entire structure during demolition and all demolition debris during loading into trucks for removal from site to the satisfaction of the Department of Community Development using a minimum three (3) inch hose. Provide a water truck or contact the City Water Department (517-768-6107) for a metered connection to a City fire hydrant. Inspection of watering must be requested by Contractor. c. Demolish the entire structure including all appurtenances attached thereto. d. Remove all footings, foundations, basement walls, and basement floors. e. Remove all debris from basements, partial basements, and foundation excavations. f. Terminate existing sanitary, storm sewer and water service lateral(s) within the foundation excavation area. Ensure watertight terminations and record the locations with triangulation measurements on the demolition permit checklist. g. Demolish or remove all garages, sheds, and accessory or temporary structures including, but not limited to, poles, decks, fences, retaining walls, carports, pools, and play structures as directed by the Department of Community Development. h. Remove all trees, shrubs and vegetation as listed on the Demolition Special Conditions provided and as directed by the Department of Community Development. i. Remove all hard surfaces including, but not limited to, concrete, masonry, asphalt, and hard packed stone or gravel. j. Remove all driveway curb and gutter openings and approaches as directed by the Department of Community Development. k. Remove sidewalk section(s) as listed on the demolition special conditions provided.

Award

Residential Subdivision

$23,800.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
429
Active Projects
228
Bidding Soon
3,243
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 9, 2026

Project location map

567 Cooper St, Jackson, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.