BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work, paving and outdoor lighting for a mixed-use development in Village of Wellington, Florida. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Limits: Midpoint Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Description: The Improvements, implemented by individual Task Work Order(s)/Work Document(s) under this Contract, consist of, but are not limited to, MOT (standard, traffic officer, low-profile barrier, free-standing barrier, ped LCD, arrow board/panel, crash cushion, PCMS, barricade, removable tape), protections (sediment, inlet), earthwork (excavation, embankment), concrete (removal, gravity wall, curb, curb/gutter, separator, sidewalk, driveway), asphalt (stabilization, base, milling, superpave, friction course, miscellaneous), pavement markings (patterned, detectable, RPM, painted, thermoplastic standard/refurbish/preformed/remove), guardrail (general, special post, end treatment, reset), handrail/guiderail, pavers, drainage (inlet, manhole, pipe culvert, trench drain), conduit (open trench, directional bore), pull/splice box, loop assembly, lighting (conductors F&I/remove, pole complete/relocate/foundation remove/foundation remain), signing (single-column F&I/relocate/remove, multi-column F&I/relocate/remove, panel F&I/relocate/remove, tubular marker, object marker, delineator tubular/replace/post F&I), utilities adjustments (valve box), electrical (load center), and sod throughout Palm Beach County. Pre-qualified: Contractor Must Be Pre-qualified. Question Deadline 03/27/2026 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - 004 - Miscellaneous Construction

GC Bidding

Roads / Highways

$1,500,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
332
Active Projects
149
Bidding Soon
2,060
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

April 13, 2026

Project location map

Multiple Locations, Village of Wellington, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.