BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2026 at 8:00 PM

Updated March 25, 2026

Site work for a development in Fergus Falls, Minnesota. Completed plans call for site work for a development.

This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Demolition and Disposal 2. Earthwork and Grading 3. Berm and Embankment Construction 4. Seeding and Restoration C. DESCRIPTION OF ALTERNATES: This project does not include alternatives. D. DESCRIPTION OF UNIT PRICES: The Bid must be based upon the estimated quantities listed in the bid worksheet within the VirtuBid area of the Quest CDN plan room for this project. Responders must provide a unit price for each item described in the bid worksheet within the VirtuBid area of the QuestCDN plan room for this project. See subsection 1.14(C) Considerations of Responses of Section 00 21 23 Instructions to Responders for additional detail on how unit prices will be utilized under a Contract. If a responder discovers an error or needs additional clarification regarding the unit prices described in the bid worksheet described above, submit a question by the end of the question-and-answer period stated in Section 00 11 14 Solicitation Advertisement Information. See subsection 1.03(B) Examination of Site and Documents of Section 00 21 23 Instructions to Responders for additional detail. Question Deadline 03/20/2026 at 12:00 PM CT The contractor's completed bid worksheet will be incorporated into the final contract. E. DESCRIPTION OF ALLOWANCES: This project does not include allowances. Responses received after end date and time will not be considered, even if errors or delays were caused by issues outside of responders' control. All costs incurred in responding to this solicitation will be borne by the responder. The 'On-line Bidding Fee Selection' 'Bidder Pays (min. $25.00)' is an additional charge to bidders who submit an online bid at the time of bid close.

Post-Bid

Conservation and Development

$335,000.00

Public - State/Provincial

Site Work

20

10

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
2
Bidding Soon
215
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

April 23, 2026

Project location map

To Be Determined, Fergus Falls, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.