Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 14, 2026 at 8:00 PM
Updated May 16, 2026
Site work and new construction of a bridge / tunnel in Morgantown, West Virginia. Completed plans call for the construction of a bridge / tunnel.
This project was awarded to Green River Group in the amount of $412,398.82 The project consists of constructing a new pedestrian and bicyclist bridge over Deckers Creek near the intersection of Pennsylvania Avenue and Brockway Avenue in Morgantown, WV. The proposed structure is a prefabricated, single-span weathering steel truss bridge approximately 78 feet long, supported by precast concrete abutments. The base bid includes construction of the two precast concrete abutments, installation of the prefabricated bridge, and construction of the trail and sidewalk asphalt tie-ins on either side of the bridge. Two additive al- ternates are included in the bid. The first alternate provides for realignment of the Deckers Creek Rail Trail on the east side of the bridge. The second alternate includes construction of ADA-compliant sidewalks and pave- ment restoration on the west side of the bridge. Depending on available funding, the Owner may proceed with the base bid alone or incorporate one or both of the additive alternates. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 5%. Question Deadline 04/09/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Email Ethan Williams at ewilliams@hrg-inc.com. The estimated cost of this Project is greater than Two Thousand Dollars ($2,000) and the federal Davis-Bacon Act shall apply. The City of Morgantown reserves the right to waive any defects, errors, omissions, mistakes, informalities, to ac- cept any bid or combination of bids that are deemed to be in the best interest of the City of Morgantown, and to reject any or all proposals.
Award
Bridges / Tunnels
$412,399.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2026
May 18, 2026
Pennsylvania Ave & Brockway Ave, Morgantown, WV
Related To This Project
Morgantown, WV
Bid Date: Mar 06 2026
Morgantown, WV
Bid Date: Apr 08 2026
Morgantown, WV
Bid Date: Apr 01 2026
Morgantown, WV
--
Morgantown, WV
Bid Date: May 20 2026
Morgantown, WV
Bid Date: Apr 22 2026
Morgantown, WV
Bid Date: May 14 2026
Morgantown, WV
Bid Date: May 14 2026
Morgantown, WV
Bid Date: Mar 25 2026
Morgantown, WV
Bid Date: Mar 16 2026
Morgantown, WV
Bid Date: Mar 31 2026
Morgantown, WV
Bid Date: Jun 18 2021
Morgantown, WV
Bid Date: Apr 27 2021
Morgantown, WV
Bid Date: Mar 26 2021
Morgantown, WV
Bid Date: May 04 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
