BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2026 at 8:00 PM

Updated March 19, 2026

Site work and paving for a civil project in Buckeye, Arizona. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

A Design Concept Report (DCR) will study Verrado Way between Yuma Rd & Beloat Rd, suggesting interim conditions and ultimate cross section for elements including but not limited to, acquisition of right-of-way and easements, utility conflicts, drainage, and efficient traffic flow. Improvements to intersection of Verrado Way & Yuma Rd will be designed with additional lanes in each direction N to Van Buren St. A Construction Manager at Risk (CMAR) will be utilized to improve Verrado Way & Yuma Rd and Verrado Way N to Van Buren St intersections. Pre-construction services include but aren't limited to, project review, cost estimates, engineering services, project planning and suggestions to improve project delivery, complete constructability reviews, provide GMPs, and assist with procurement. The CMAR completes construction services including but not limited to, construction as designed, subcontractor selection per plan, and public outreach requirements. Improvements outside this scope, excluding in-lieu contributing parcels, are not included. The project is included in the City's 2026-2030 Capital Improvement Program (CIP).As of March 06, 2026, further details have not yet been identified. As of March 11, 2026, this CIP is in the planning and design phase for FY 2026. Construction is anticipated to begin FY 2027 and continue through FY 2028. This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$14,900,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
0
Bidding Soon
600
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.