Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 16, 2026 at 8:00 PM
Updated March 18, 2026
Renovation of a municipal facility in Buckeye, Arizona. Design plans call for the renovation of a municipal facility.
Combine City Hall Rooms 330, 331, and 332 and convert into a large-scale event space with a focal wall for photographs and social media opportunities. Add ITS infrastructure to support a fully functional conference space, cabinetry and appliances, and finishes to complete the space. On the 1st floor of City Hall, 2 conference rooms will be added; one where the Welcome Desk is currently located, moving the desk closer to the front door, and another just to the right of where the Welcome Desk is currently located. The glass wall to the right of the entry doors will be replaced with a solid wall and the front right quarter of the building will be reconfigured to include an additional small conference room in the front right corner and additional desk and office space. It is anticipated that a threat analysis at the beginning of the design process will stipulate the specific force protection measures required. This scope excludes any construction to the City Hall building outside the two areas outlined above, as well as any improvements requiring structural or architectural plans. The project is included in the City's 2026-2030 Capital Improvement Program (CIP) As of March 13, 2026, this project has been approved for design and construction in FY 2026. Information regarding architect selection has not been announced. This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Method of contractor selection has not been determined at this time.
Design
Municipal
$700,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 25, 2026
530 Monroe Ave, Buckeye, AZ
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
