BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Bunnell, Florida. Completed plans call for site work for a water / sewer project.

Sealed bids for furnishing all labor, materials, equipment and supervision for nourishment of portions of the Flagler County beach and dune system in conformance with the project plans and contract documents. The project will consist of constructing and an elevated beach berm, dune and vegetation in accordance with the project plans and specifications. The scope of work includes but is not limited to the following: mobilization/demobilization; preparation and restoration of the work site and access points, mechanical screening of dredge material; structural inspection and vibration monitoring; beach tilling/decompaction; endangered species monitoring and observation; sea turtle trawling; sand fencing and post & rope; and placement of sand and dune vegetation, performance of all operations and surveys in connection with the construction and other related items incidental to the work as the Bid in accordance with the Contract Documents. All work shall be constructed in accordance with the Contract Documents. Question Deadline 04/03/2026 at 2:00 PM ET All questions or concerns related to this RFP must be submitted in writing and directed exclusively to the Flagler County Office of Procurement and Contracts. Questions should be submitted through the Questions & Answers section on OpenGov. The period of performance is 365 days from NTP. Bids must be accompanied by a certified check, bank draft, or satisfactory Bid Bond, drawn in the favor of Flagler County in the amount of five percent (5%) of the total bid as shown on the Bid Form. No Bidder may withdraw his Bid after the scheduled closing time for receipt of Bids. All Bids must be firm for a period of one hundred twenty (120) days after the time set for opening Bids. The successful Bidder will be required to furnish and pay for satisfactory Contract Bonds (Performance and Payment) and appropriate Warranty Bond. Upon award of contract, a Certificate of Insurance must be provided indicating compliance with the criteria and for the coverage(s) in the Standard Terms and Conditions of the Agreement between the County and the selected Contractor. Flagler County reserves the right to reject any and all Bids, to award all or segments of the project and to waive any informality in Bids received, as may be in the best interest of the County. Pre bid meeting notes: Although the Pre-Bid Meeting is not mandatory, it will offer potential bidders the only opportunity to ask questions and discuss the project directly with staff.

Post-Bid

Water / Sewer

$16,000,000.00

Public - County

Site Work

10

22

32

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
283
Active Projects
113
Bidding Soon
1,543
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

July 6, 2026

Project location map

Multiple Locations, Bunnell, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.