Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2026 at 8:00 PM
Updated March 25, 2026
Site work and paving for a road / highway in Toledo, Ohio. Conceptual plans call for site work for a road / highway.
The City of Toledo is requesting proposals from qualified firms to provide professional design and engineering services for the Huron and Madison Infrastructure Project. The project will modernize infrastructure and enhance the streetscape along Huron Street (from Adams Street to Jefferson Avenue) and Madison Avenue (from St. Clair Street to Erie Street). The goals are to improve pedestrian safety, accessibility, traffic flow, and aesthetic appeal through new utilities, lighting, streetscape enhancements, and placemaking features. Proposals must include a response file, professional services project paperwork, price proposal, signed professional services contract, child support affidavit, Bureau of Workers Comp certificate, and insurance certificate. Additional uploads may be necessary. All questions must be submitted through the Q&A Tab. established Minority Business Enterprise (MBE) goalsfor all City of Toledo construction projects, HUD assisted construction projects, and suppliers of goods and services. Likewise, Administrative Policy & Procedure# 13 reiterated and enhanced the City of Toledo's MBE goals. Specifically, the MBE goalsfor the City of Toledo are: 21% in HUD assisted construction projects, 15.0% in City construction projects, 10% in City-funded purchases of goods, materials, supplies and services. Ordinance# 838-91, as well as AP&P# 13, requires that the Office of Diversity & Inclusion establish procedures and guidelines for the implementation of this goal. All City of Toledo departments, divisions, boards, and agencies, as well as, other entities that receive funds through the City of Toledo for construction, renovation projects, goods, materials, supplies, and services shall commit to a "Good Faith Effort" in achieving the City of Toledo's MBE goals
Conceptual
Roads / Highways
$1,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2026
May 8, 2026
Madison Ave & N Huron St, Toledo, OH
Related To This Project
Toledo, OH
Bid Date: Jun 22 2021
Toledo, OH
Bid Date: Oct 01 2020
Toledo, OH
--
Toledo, OH
Bid Date: Feb 06 2019
Toledo, OH
Bid Date: Mar 24 2026
Toledo, OH
Bid Date: Apr 07 2026
Toledo, OH
Bid Date: Mar 31 2026
Toledo, OH
Bid Date: Apr 07 2026
Toledo, OH
Bid Date: Mar 31 2026
Toledo, OH
Bid Date: Mar 17 2026
Toledo, OH
Bid Date: Mar 24 2026
Toledo, OH
Bid Date: Mar 27 2026
Toledo, OH
Bid Date: Mar 11 2026
Toledo, OH
Bid Date: Mar 13 2026
Toledo, OH
Bid Date: Mar 17 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
