Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a sidewalk / parking lot in Watsonville, California. Completed plans call for site work for a sidewalk / parking lot.
The work to be completed consists of the sawcutting, removal, and replacement of sidewalk, curb and gutter, driveway approaches, and curb ramps at various locations within the City. The contractor will be notified of the work to be accomplished and it must be completed within thirty working days of the notice. The locations and square footage will be identified and reported to the City, which will issue work orders specifying the locations and scope for each job. The contractor is responsible, at their own expense, for hauling and disposing of all pavement, concrete, brick, dirt, and other excavated material at the City facility. Concrete for curbs, sidewalks, and related items must contain at least 564 pounds of cementitious material per cubic yard and be constructed with Class 2 aggregate base, compacted to specified densities. All new concrete work must match and conform to adjacent concrete and comply with ADA standards. The contractor is responsible for construction surveying, preservation of benchmarks and reference points, and restoration of any damaged utilities or property. All construction must conform to the City of Watsonville Public Improvement Standards and relevant state specifications. Work is to be performed Monday through Friday from 7:30 AM to 4:30 PM, not including City holidays. Instructions to bidders include requirements for contractor licensing, prevailing wage compliance, insurance, registration with the Department of Industrial Relations, submission of bids electronically, responsibility for all permits and fees, inclusion of all pay items in the bid, and the furnishing of certified payroll records. Bids must include a statement of experience and a list of proposed subcontractors. uestion Deadline 03/20/2026 at 8:00 AM PT
Award
Sidewalks / Parking Lot
$119,070.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2026
April 23, 2026
Multiple Locations, Watsonville, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
