BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 23, 2026 at 7:00 PM

Updated February 25, 2026

Site work and paving for a mixed-use development in Watsonville, California. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City is requesting Proposals from qualified firms experienced in construction management (CM) and inspection services for the SAFER ACCESS TO PAJARO VALLEY HIGH SCHOOL and BEYOND Project to provide construction management and inspection services through the duration of the project. The construction contract includes 3 parts: Relocation of the 6-inch sanitary sewer force main; Widening the existing Caltrans-owned bridge over Highway 1 (Harkins Slough Rd.) Pedestrian and bicycle safety improvements near feeder schools, including curb ramp replacement and striping improvements. The plan is to improve conditions for walking and bicycling to Pajaro Valley High School and its feeder schools. The existing overpass (Bridge No. 36-0089) has a single 5-foot wide sidewalk and no bike lanes. The widened structure will support a 6-foot wide sidewalk and bi-directional bike lanes with a concrete barrier between the bike lanes and vehicle traffic. The bridge widening will be supported by driven piles and pre-cast concrete beams. To prevent damage to the existing sanitary sewer force main which is currently under Highway 1, a new sanitary sewer force main shall be installed through an existing casing within the bridge. Work includes tying into the existing system. Offsite pedestrian and bicycle safety improvements include curb ramp replacements, high visibility crosswalks and green buffered bike lanes at school sites that feed into PVHS. The City of Watsonville is the lead agency for this project, with Caltrans providing oversight engineering for all work within the Caltrans right-of-way. Responses to Questions Issued via Addendum by: March 12, 2026 Interviews (If Needed): Week of March 30, 2026 Execution of Agreement with Consultant: April 2026 The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$11,000,000.00

Public - City

Paving, Site Work

118

28

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
8
Bidding Soon
1,322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

March 17, 2027

Project location map

500 Harkins Slough Rd, Watsonville, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.