BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 29, 2026

Site work for a civil project in Clearwater, British Columbia. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The District of Clearwater invites tenders for the supply of Rip Rap for the reconstruction of the bank protection at the Old North Thompson Highway Bridge project in Clearwater. A summary of specific work items includes the following (approx. quantities): Supply of 3,014 Tonnes of 250 kg Riprap Supply of 80 Tonnes of 10 kg Riprap Stockpiling of supplied materials, separated by Riprap class, at the proposed laydown area Optional Work for supply of up to an additional 15% of the total riprap quantities above Electronic Contract Documents are available at no charge on BC Bid (Adobe PDF format).

Post-Bid

Bridges / Tunnels

$500,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
19
Bidding Soon
246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2026

September 16, 2026

Project location map

Multiple Locations, Clearwater, BC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.