Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a transportation facility in Mountain View, Missouri. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The Owner's Engineer must receive the written request a minimum of seven (7) calendar days prior to the date of the bid opening. Requests may be emailed to Elizabeth Duvall, Project Manager at eduvall@benesch.com and Brad Waller, Project Designer at bwaller@benesch.com. Question Deadline 03/31/2026 Prequalification: Contractors bidding need not be pre-qualified but shall be qualified to do the work. MODOT - Mountain View Airport (MNF) - Rehabilitate Runway 10/28 Project Description. Runway 15-33 is currently 7820 feet long, with a 500 foot stopway on the north end. This project will remove the stopway and extend the runway 1000 feet to the north and 500 feet to the south. Finally, the existing portion of the runway will be repaved. The runway 33 glide slope will be relocated. The new runway 33 localizer has already been installed by FAA Technical Operations and only needs to be switched on. Runway 15 is currently served only by a localizer, which will remain in operation as it will be beyond the future RSA. Appropriate NOTAMS will be issued throughout the project.

Bid Results

Transportation Terminals

$2,330,033.00

Public - City

Paving, Site Work

54

24

12

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
20
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

September 21, 2026

Project location map

316 Airport Rd, Mountain View, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.