BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 28, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a medical facility in Charlotte Ama, Virgin Islands. Completed plans call for the construction of a medical facility; and for site work for a medical facility.

The Virgin Islands Office of Disaster Recovery, a division of the Virgin Islands Public Finance Authority, is soliciting proposals from qualified and licensed firms to provide Construction Manager At-Risk (CMAR) Services for the Governor Roy L. Schneider Hospital on St. Thomas. The selected firm will be responsible for rebuilding the damaged hospital and replacing it with a new, state-of-the-art healthcare facility. Proposers must demonstrate their experience in their submissions, which will be evaluated according to the qualification criteria outlined. The scope of services to be performed by the selected firm is defined in the package. All proposals will be accepted by email and are subject to review, acceptance, or rejection by the Office of Disaster Recovery. For information or queries, please contact PFA's Procurement Division at procurements@usvipfa.com. Completion- 13-Apr-33 Should VIODR and the Contractor agree on the GMP, the Construction Phase will be authorized and initiated following VIODR approval of a Modification to the Agreement. The construction services will include, but are not limited to, all vertical construction, utilities, site work, and civil. The site work infrastructure also includes, but is not limited to, coordination with public utilities, communications providers, mechanical, electrical, plumbing, and fire protection for the construction. The Contractor will procure all subcontractors and vendors, and will be responsible for the Project's construction, startup, provide commissioning support (Commissioning Agent will be appointed direct by the VIODR), operator training, performance testing, warranty services, and subsequent occupancy of the facilities noted in the scope of work. The scope of work may include consideration of alternate projects to include additional buildings, roadways, and services whether contiguous to the site and building or freestanding, and programming of their services. In addition to those services described above, Contractor is expected to perform one or more of the following non-exhaustive lists of services: o Construct the Project. o Mitigate Project risks. o Procure equipment and subcontractors not required to be listed in the GMP Proposal and manage Work by subcontractors. o Self-perform elements of the Project scope as approved by VIODR and allowed by law. o Secure necessary construction permits. o Maintain site safety and security. o Prepare and conform to quality management plan. o Develop an initial punch list and issue to subcontractors prior to formal punch list issued by Design Consultant. The Contractor shall ensure completion of the initial punch list prior to Design Consultant's punch list walkthrough. Work cooperatively with the Project Team to develop and implement an effective commissioning plan. o Implement and maintain cost control methods with "open book" sharing of cost information. o Inform VIODR of pending cost issues within five (5) business days of identifying potential issues. o Prepare a monthly report with each progress billing that details a project work status report, buyout to schedule of value analysis, contingency status, schedule status and project progress commentary with applicable job-site photos. Provide other formal communications as requested by VIODR. o Provide for a just-in-time delivery approach within the schedule for interventional and technology spaces, like radiology/imaging, operating rooms (OR's), and procedure rooms, such that the Owners medical equipment can be installed without modification to the space. Shop drawings for the Group 1 medical equipment will be provided to the Contractor for coordination approximately a year and a half prior to the scheduled completion of the project to allow for the most recent commercially available equipment to be incorporated into these spaces. o Timely submit operation and maintenance manuals and completed punch lists, coordination of training, submission of as-built field documents, BIM model and financial close-out of project. The Contractor shall actively support and participate in commissioning activities. o Assist VIODR in working with various governing authorities as requested.

Post-Bid

Medical

$100,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
3
Bidding Soon
31
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2026

January 8, 2027

Project location map

To be determined, Charlotte Ama, VI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.