BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a playground / park / athletic field in Sterling, Illinois. Completed plans call for site work for a playground / park / athletic field.

As of April 28, 2026, this project has not yet been awarded. A timeline for award has not yet been established. Work will include site clearing, earthwork operations, drainage, asphalt paving, color coating, concrete curbs, walks and paving, playground equipment installation, chain link fencing, shade canopy installation, landscape plantings, turf seeding and native seeding. All bids must be submitted in a sealed envelope marked with the Contractor's name and address, and "Bid for Thomas Park," on the face of the envelope. All bidders will be required to submit Bid Security in the form of a Bid Bond, Certified Check, Cashier's Check in the amount of 10% of the Base Bid, payable to the Sterling Park District. The Sterling Park District reserves the right to reject any and all proposals, parts of any and all proposals, or to waive technical errors or omissions in submitted proposals. No submitted bid may be withdrawn until a period of sixty (60) days after the bid opening date, without written consent of the Sterling Park District. The Sterling Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. The successful bidder shall be required to pay, and to agree to pay no less than the Prevailing Rate of Wages, pursuant to the Illinois Prevailing Wage Act (820 ILCS 130) for the locality of the Sterling Park District (Whiteside County), to each laborer worker, or mechanic needed or used to complete the work as detailed in the contract to be let. The successful contractor, and all sub-contractors shall be required to submit, to the Illinois Department of Labor certified payrolls no later than the tenth day of each calendar month for the immediately preceding month. Work must comply with grant requirements.

Award

Playgrounds / Parks / Athletic Fields

$995,831.00

Public - City

Site Work

23

18

16

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

May 1, 2026

Project location map

2301 12th Ave, Sterling, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.