BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a transportation facility in Pocahontas, Arkansas. Completed plans call for site work for a transportation facility.

The scope of work includes the rehabilitation of the asphalt taxiway pavement, rehabilitation of the existing windcone, and installation of two wind cones at the Pocahontas Municipal Airport. Sealed bids are to be submitted on a unit price basis. Bidders are required to download bid documents from the designated online plan room and must enter addenda numbers in their proposals to verify receipt. The Bidder must supply all required information on the bid or proposal form. Question Deadline 03/26/2026 Any person contemplating the submission of a Bid shall have thoroughly examined all of the various parts of these Documents and, should there be any doubt as to the meaning or intent of said Contract Documents, the Bidder should request of the Engineer, in writing (received by the Engineer at least 5 working days prior to bid opening), an interpretation thereof. A 5% bid security is required with the bid. The Bidder must have a current general license from the Arkansas Contractor's Licensing Board before the bid proposal will be considered. The successful Bidder will be required to submit a Certification of Nonsegregated Facilities prior to award of contract and notify prospective subcontractors of this requirement if their subcontract exceeds $10,000. For contracts of $50,000 or more, contractors and certain subcontractors must maintain an affirmative action program within 120 days of contract commencement. Federal Davis-Bacon wage rates shall apply. Work is to be completed within 65 calendar days from Notice to Proceed. The Owner reserves the right to reject bids and waive formalities. The bid proposal and work must adhere to all applicable federal, state, county, and local laws, ordinances, and regulations. The Contractor's Qualification Statement (AIA Document A305) must also be submitted as a prerequisite to award, unless submitted in the past six months for review. MCE PROJECT NO. 25-5816 AIP NO. 3-05-0053-020-2026 (AIP) AIP NO. 3-05-0053-021-2026 (AIG)

Bid Results

Transportation Terminals

$275,859.00

Public - City

Site Work

12

7

7

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
26
Bidding Soon
378
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

May 4, 2026

Project location map

2006 Airways Lane, Pocahontas, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.