BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a bridge / tunnel in Bradford Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

The project consists of the replacement of the bridge on T-210 (Millstone Road) over Millstone Run. The successful bidder shall provide all labor, material, tools, and equipment needed to complete the project, except for the structural plate arch and the steel express foundations, which will be provided by Bradford Township. The successful bidder will assemble the arch plates and steel express foundations, and provide concrete for the steel express foundations. The replacement structure is a single-radius, galvanized steel, arch with dimensions of 19'-0" span x 8'-3" rise and an arch length of 36'-0". The scope of work also includes constructing cast-in-place concrete wingwalls, a concrete collar on both ends of the arch, and guide rail. All materials must meet current PennDOT specifications and be Bulletin 15 approved. A bid bond or certified check in an amount equal to 10% of the bid price is required with the bid. The successful bidder must provide performance and payment bonds, each in an amount equal to 100% of the bid price. Federal Davis-Bacon Wage Rates will apply. The sealed envelope containing the bid shall be marked "Bid for T-210 Bridge Replacement". The township reserves the right to reject any or all bids. Bidders are solely responsible for getting their bid to the township by the specified date and time. Any bids received after the deadline will not be accepted. Copies of the bidding documents will be sent via e-mail to prospective bidders. 1. Install erosion and sediment pollution control measures . 2. Install temporary cofferdams and pumping equipment to divert stream flow around the work areas . 3. Demolish existing structure . Existing structure consists of a 19'-0" span x 8 '-3" rise x 33 ' long single -radius , galvanized steel arch . Structure also contains concrete abutments , concrete wingwalls , and gabion basket wingwalls . 4. Assemble 19'-0" span x 8'-3" rise x 36 ' -0" long galvanized steel structural plate singleradius arch . 5. Excavate to the lines and grades needed for installation of the arch and wingwall footings . Layback slopes per OSHA requirements . 6. Place Class C concrete or Flowable Fill beneath the proposed footings , as needed , to fill any over -excavated areas of the rock bearing surface to the required bottom of footing elevation . 7. Install the steel express foundations on the prepared base and fill with concrete . Install the single -radius arch on the steel express foundations . 8. Construct the wingwall footings on the prepared base . Construct the stem walls on the wing wall footings , and the concrete collars at each end of the arch . 9. Install R -6 rock riprap . 10. Place structure backfill behind the wingwalls and on top of the arch . Place fill material in areas outside of the structure backfill , to bring the ground surface outside of the road to finished grade , and to bring the ground surface under the road to subgrade level . 11. Install approach guide rail and end treatments . Construct concrete slabs above arch for attaching guide rail posts . 12. Install approach guide rail and end treatments . 13. Site restoration and clean -up .

Award

Bridges / Tunnels

$291,126.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
132
Bidding Soon
1,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 7, 2026

Project location map

Millstone Rd, Bradford Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.