Published March 13, 2026 at 8:00 PM
Updated March 14, 2026
Site work for a transportation facility in Salem, Oregon. Conceptual plans call for site work for a transportation facility.
Submit questions and responses via the Marion County Procurement Collaboration Portal. Electronic copies of the RFP and attachments can be obtained from the Marion County Procurement Collaboration Portal. Log into the Procurement Collaboration Portal, sign in or create an account (creating an account must be completed 15-30 minutes before files can be submitted), and use the Solicitations tab to search and view solicitations. To view documents, scroll to the Files, Documents, Images section under Public Files. To submit a question, use the Questions & Answers section. To register as a respondent, click Register as Respondent. To submit documents, select a file, choose a File Category, type a description, and click Save File. For response status, scroll to the Response Status section, select the appropriate status, and click Submit. Estimated range of costs for the A&E and Related Services required for Phase 1 (see 1.3 below) under this RFP: $600,000 to $800,000. Agency anticipates the contracted Services will be phased as follows: _ Phase 1 - Corridor Planning (survey, right of way determination, draft environmental studies, conceptual design, cost estimates and related services for the 6.1 miles of trail from Fishermen's Bend through Mill City and the City of Gates to the Maples Rest Area) _ Phase 2 - Preliminary Engineering through Final Design (PS&E) of the portion of the trail segment above as chosen by the Agency limited to the available construction funding. Additional segments may be added if supplemental funding for construction is secured. Authorization of this phase is solely dependent on available funding. _ Phase 3 - Construction contract administration, construction engineering and inspection ("CA/CEI") for construction of the trail segments chosen for Phase 2. Authorization of this phase is solely dependent on available funding. Following Final Design, Agency may, at its discretion: (a) negotiate and amend the Contract to include all CA/CEI Services (or various elements), (b) complete various elements of construction oversight work with Agency's in-house staff, or (c) assign various elements of CA/CEI Phase to another consulting firm. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Transportation Terminals
$800,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2026
June 18, 2026
OR-22, Salem, OR
Related To This Project
Salem, OR
Bid Date: Apr 14 2026
Salem, OR
Bid Date: Apr 07 2026
Salem, OR
Bid Date: Apr 02 2026
Salem, OR
Bid Date: Apr 15 2026
Salem, OR
Bid Date: Mar 24 2026
Salem, OR
Bid Date: Apr 01 2026
Salem, OR
Bid Date: Apr 01 2026
Salem, OR
Bid Date: Apr 02 2026
Salem, OR
Bid Date: Apr 02 2026
Salem, OR
Bid Date: Mar 30 2026
Salem, OR
Bid Date: Mar 24 2026
Salem, OR
--
Salem, OR
Bid Date: Mar 17 2026
Salem, OR
Bid Date: Mar 17 2026
Salem, OR
Bid Date: Mar 19 2026