Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2026 at 8:00 PM
Updated March 25, 2026
Renovation of a mixed-use development in Saint Louis, Missouri. Working plans call for the renovation of a medical facility.
The work consists of preparing the existing space for a new Computed Tomography system in Room A259 at the VA Saint Louis Health Care System, John Cochran Division, including the installation of a dedicated HVAC system to support CT procedures. The project requires the refreshment and renovation of Rooms A259 and A259A based on drawings and specifications provided by an Architectural-Engineering firm. Required work includes general construction, alterations, mechanical, electrical, and plumbing work, utility systems, fire protection systems, abatement work, demolition and removal of existing structures, and all associated appurtenances necessary for completion. All work shall comply with contract terms and conditions, specifications, drawings, VA Technical Information Library requirements, and all applicable local and national codes. The contractor shall furnish all supervision, tools, labor, materials, equipment, transportation, and testing required, and shall conduct site investigations to fully understand existing conditions and constraints. The contractor shall review all available as-built drawings, specifications, and verified field conditions and ensure that all installation details are coordinated with the Contracting Officer and on-site COR. The period of performance is 210 calendar days, which includes final inspection and clean-up. Location: Saint Louis VA Medical Center, John Cochran Division, 915 North Grand Boulevard, Saint Louis, Missouri 63106, United States. The estimated cost magnitude is between $1,000,000 and $2,000,000. Period of Performance for all work is 210 calendar days. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Medical
$2,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2026
915 N Grand Blvd, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Mar 23 2026
Saint Louis, MO
Bid Date: Mar 11 2026
Saint Louis, MO
Bid Date: Mar 11 2026
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Apr 03 2026
Saint Louis, MO
--
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Mar 31 2026
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Mar 31 2026
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Mar 05 2026
Saint Louis, MO
Bid Date: Mar 03 2026
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Mar 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
