BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 22, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work and addition to a transportation facility in Philadelphia, Pennsylvania. Completed plans call for site work for a transportation facility; for the addition of a transportation facility; and for the demolition of a transportation facility.

Philadelphia International Airport Terminal D/E Baggage make Up Expansion - Mechanical Bid Range: $500000 $ 1000000 Question Deadline 03/31/2026 The due date for filing completed questionnaires *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. THIS CITY OF PHILADELPHIA, DEPARTMENT OF AVIATION (DOA) PROJECT CONSISTS OF, BUT IS NOT LIMITED TO, RETROFIT AND EXPANSION OF THE EXISTING DOA MAINTENANCE SPACE ADJACENT TO JETBRIDGE GATE E2. SCOPE ALSO INCLUDES CONSTRUCTION OF A NEW BAGGAGE CONVEYOR BRIDGE CONNECTING THE EXISTING D/E BAGGAGE MAKE-UP BUILDING TO THIS NEW BAGGAGE MAKE-UP FACILITY IN TERMINAL E. THE PROJECT SCOPE IN ADD-ALTERNATE 1 INCLUDES, BUT IS NOT LIMITED TO, CONSTRUCTION OF A NEW BAGGAGE MAKE-BUILDING ADJACENT TO JETBRIDGE GATE D1, INCLUDING A NEW BAGGAGE CONVEYOR BRIDGE CONNECTING THE EXISTING D/E BAGGAGE MAKE-UP BUILDING TO THE NEW D BAGGAGE MAKEUP BUILDING The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Retrofit and expansion of the existing DOA maintenance space underneath the current USO to accommodate a new baggage handling make-up unit which would be connected via a bridge to the existing Terminal E. Additionally, it includes repair work at existing adjacent apron and Inner Vehicle Service Road indicated in the Contract Documents. 2. Construction of a new building to accommodate a new baggage handling make-up unit which would be connected via a bridge to the existing Terminal D. Additionally, it includes repair work at existing adjacent apron and Inner Vehicle Service Road indicated in the Contract Documents. a. See Section 012300 "Alternates" MECHANICAL CONTRACT A. Work of the Mechanical Contract includes, but is not limited to, the following: 1. Energy supply, including gas supply systems. 2. Mechanical systems and equipment. 3. Mechanical instrumentation and controls. 4. Mechanical testing, adjusting, and balancing. 5. Building automation system. 6. Mechanical connections to equipment furnished by the General Construction Contract. B. Temporary facilities and controls in the Mechanical Contract include, but are not limited to, the following: 1. Temporary heating, cooling, and ventilation of enclosures. The permanent building Mechanical systems will not be utilized to support heating and cooling of the project building during construction.

Bid Results

Transportation Terminals

$1,000,000.00

Public - City

Addition, Demolition, Site Work

365

31

81

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
997
Active Projects
514
Bidding Soon
6,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

May 21, 2026

Project location map

8500 Essington Ave, Philadelphia, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.