BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a power facility in Philadelphia, Pennsylvania. Completed plans call for site work for a power facility.

FCA-1 Substation Relocation at Philadelphia International Airport. Bid No. 6706 PHL-1666.35. Bid range is greater than $5,000,000. Quotes must be submitted electronically on the designated platform. No quotes will be accepted unless a complete Questionnaire and Financial Statement, with all questions fully answered, is filed within Pre-Qualification Solicitation B2626364 on the specified platform. Instructions include obtaining bid package documents electronically from the provided website and submitting all quotes before the stated deadline. Pre-qualification requirements: A complete Questionnaire and Financial Statement with all questions fully answered must be filed within Pre-Qualification Solicitation B2626364 on the specified website. PROJECT DESCRIPTION A. This project includes the replacement of the FCA-1 Substation located in Terminal A-East at the Philadelphia International Airport. This replacement includes the low voltage switchgear, MV transformers and MV switches. The substation is fed from 15kV lines #13 & #14 from the Main Terminal Substation. The existing transformers and switches will be replaced outdoors on an elevated platform, and the new switchgear will be housed on the roof of the existing substation room. All client design standards and city and national design standards outlined in the 2024 PHL AE Design Standards will be adhered to in this project. The low-voltage feeders will penetrate through the roof from the new switchgear to re-connect to their distribution panels. Major tasks in this project include: a. Demolition of existing switchgear at substation FCA-1. b. Structural and architectural designs for supporting/housing new equipment. c. Temporarily feeding existing loads during construction. d. Installing and testing new switchgear equipment and related accessories. e. Phasing and minimizing power outages during construction with temporary power solutions.

Bid Results

Power Plant

$7,999,500.00

Public - City

Site Work

79

17

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

June 1, 2026

Project location map

8500 Essington Ave, Philadelphia, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.