BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 15, 2026

Site work and new construction of a warehouse / distribution facility in Cincinnati, Ohio. Completed plans call for the construction of a 4,000-square-foot warehouse / distribution facility.

Question Deadline 03/20/2026 Offeror shall provide and install onsite a pre-manufactured storage building on a concrete slab at the Mill Creek Barrier Dam, 798 Evans St., Cincinnati, OH 45204. The proposal shall include pricing for all material, equipment, installation, and shipping costs for a complete turn-key structure. The proposal shall also include required design drawings for permitting, permits, and inspections as may be required by applicable local, state, and/or federal requirements. The scope of work for this project shall include but is not necessarily limited to the following: a minimum of 4000 square feet, 36 ft x 115 ft, steel construction (painted), insulated walls and roof, gutters, five commercial grade steel 12'x14' garage doors (non-insulated), and two commercial grade steel man-doors (with deadbolt locks). The services to be obtained are concrete repair and rehabilitation of existing concrete driveways, vertical concrete walls, concrete elevated slabs, concrete joints, and structural concrete support members at SMU's Barrier Dam Pump Station facility. provide concrete spall and crack repairs at the west ramp, discharge bay, and transformer platform structures. replace expansion joint seals at the west ramp, discharge bay, and transformer platform structures. provide new bearing enhancements at beams 17 and 19 at the south end of the transformer platform. provide steel repairs for the underdeck tie at the southwest corner of the transformer bay platform. This is an online bid divided into three volumes. Volume One is the Bid information and does not need to be returned. Volume Two is the Forms and questionnaires that must be completed. Volume Three is the Excel pricing sheets and must be completed in the highlighted areas and returned as an attachment with the signed forms in Volume Two. In VSS you will only need to enter the Unofficial Total on line one. Bidders must submit bids electronically through the City's Vendor Self Service website and must be registered to submit a bid. Bidders must submit pricing on all commodity lines on the electronic bid. Blank pricing on commodity lines will be considered a bid of $0.00. Questions or requests for additional information regarding this solicitation shall be directed in writing to the assigned City of Cincinnati Buyer, Alexa Kafury, via email at alexa.kafury@cincinnati-oh.gov. Completion- 180) calendar days The MBE subcontracting goal for this bid is 5%. The WBE subcontracting goal for this bid is 00%. Question Deadline 03/20/2026 Questions or requests for additional information regarding this solicitation shall be directed in writing to the assigned City of Cincinnati Buyer, Alexa Kafury, via email at alexa.kafury@cincinnati-oh.gov.

Bid Results

Warehouse / Distribution

$921,444.00

Public - City

New Construction, Site Work

15

4

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
132
Bidding Soon
1,511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

May 1, 2026

Project location map

798 Evans St, Cincinnati, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.