BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a civil project in Oak Creek, Wisconsin. Completed plans call for site work for a water / sewer project.

The Project contemplated consists of: 1. Demolition of high lift pumping and electrical equipment and installation of new electrical equipment in the existing High Lift Pump Station. 2. Demolition of backwash waste pumping and equipment and installation of new backwash waste pumping and equipment in the existing Backwash Recovery Basin. 3. Demolition of an existing metering vault. 4. Construction of a new, multi-level Pump Station including: a. Intermediate, high lift, and backwash vertical turbine pumps, b. Intermediate pump wetwells, c. Ultraviolet (UV) room with UV disinfection units and associated piping to new Chlorine Contact (CT) Tank, d. Fluoride room with fluoride chemical storage and feed equipment, e. Electrical room with new electrical equipment, including motor control centers and adjustable frequency drives, f. Overhead bridge crane and monorails for equipment handling, g. Surge control tank system, h. Pre-engineered sump pump system, and i. Walkway connecting the new Pump Station to the existing Water Treatment Plant. 5. Construction of a new, above grade, cast-in-place concrete CT Tank supported on piles. 6. Modification of an existing 2.4kV generator to support 480V service in the existing Water Treatment Plant. 7. Modification of the existing Water Treatment Plant to connect to the new CT Tank and to disconnect from the existing, below grade CT Tank. 8. Installation of yard piping connecting the new Pump Station and CT Tank to the existing water system. 9. Installation of security equipment, systems, and perimeter fencing for the new facilities. 10. Management of soil excavation, earth retention, shoring and protection of the existing facilities, and sitework for the new stormwater facilities, access road, and landscaping, including contaminated soil which will be managed on site. 11. Management of sequence of Work to ensure that the existing Water Treatment Plant and all associated services remain online and fully operational throughout the duration of the Project. All work will be awarded in a single contract. The Work will be completed in all respects within 1,095 calendar days from the date when the Contract Times commence to run.

Award

Water / Sewer

$49,565,000.00

Public - City

Site Work

165

41

84

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
259
Bidding Soon
4,164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2026

June 7, 2026

Project location map

9325 5th Ave, Oak Creek, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.