BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a road / highway in Waycross, Georgia. Completed plans call for site work for a road / highway.

Signage and Striping Improvements to Various Roads (62.195 Miles) in Ware County, Georgia, funded through the FY 2025 Safety Action Plan. The work includes furnishing all materials, labor, tools, equipment, and incidentals necessary for the installation of these improvements. All work must be completed within 180 consecutive calendar days of the notice to proceed. Construction is not permitted on Memorial Day, Labor Day, the week of July 4th, Thanksgiving (starting at 12:00pm Wednesday prior until the following Monday), and Christmas and New Year (starting on Christmas Eve until January 2; if January 2 falls during a weekend, work resumes the following Monday). All materials, workmanship, testing, etc. must meet the Georgia Department of Transportation Standard Specifications, 2021 Edition, any applicable Supplemental Specifications, 2024 Edition, or Special Provisions contained within the contract. The Owner reserves the right to reject all bids, waive informalities, and accept any Bid which in its opinion may be in the best interest. The Owner may add or delete from the Contract once it has been awarded. No bids shall be withdrawn for a period of 60 days after the opening of the bids. All proposals must include a Bid Bond in the amount of at least five percent (5%) of the lump sum bid. The successful bidder must provide Performance and Payment Bonds each equal to 100 percent of the contract amount. All Bidders must obtain a bid package from the Engineer to be considered certified; bids from non-certified Bidders will not be considered. The Contractor must be a current "Prequalified Contractor" with the Georgia Department of Transportation, Office of Contract Administration or be approved in writing by the Ware County Board of Commissioners before the bid opening. A copy of the Contractor’s "Notice of Contractor Qualification" from the Georgia Department of Transportation or an approval letter from the Coffee County Board of Commissioners must be submitted with the bid.

Post-Bid

Roads / Highways

$400,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
73
Bidding Soon
1,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2026

May 29, 2026

Project location map

To be determined, Waycross, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.