BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a bridge / tunnel in Kenosha, Wisconsin. Completed plans call for the renovation of a bridge / tunnel.

In general, the work consists of existing utility tunnel concrete floor repairs at the University of Wisconsin - Parkside Utility Distribution Tunnel in Kenosha, Wisconsin. The base bid will be received for a single lump sum bid for all work. All potential bidders must be certified by the Department of Administration (DOA) prior to submitting bids for state construction projects over $100,000. Bids from non-certified contractors will be rejected. This project uses a single prime bidding and contracting process. The Division of Facilities Development (DFD) will publicly bid the mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify the lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor, who will enter into subcontracts with the successful MEP bidders. Sealed bids will be received as PDF scanned files of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures, submitted via the eBuilder Bidding Portal (preferred method); by US Mail or third-party delivery to the State of Wisconsin Administration Building; or by hand delivery to the drop box labeled SEALED BIDS ONLY at the same location. The bidder is responsible for ensuring the sealed bid is delivered to the indicated location or submitted via the eBuilder Bid Portal before the specified time for submission. Third party delivery is entirely at the bidder's risk. A bid guarantee in the amount of 10% of the bid must accompany each bid submitted. Contract offer and construction phase records will be processed electronically via eBuilder. Bidding documents (drawings, specifications, and addenda) may be obtained only as electronic files (in PDF format) as a downloadable file from the Division's Projects Bidding website or seen at various Builders' Exchanges. No deposit is required to obtain bidding documents. Additional project bidding information, including plan holders lists, are available on the Division of Facilities Development public website.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - State/Provincial

Renovation

6

19

2

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

November 1, 2026

Project location map

To be determined, Kenosha, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.