BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a water / sewer project in Rolla, Missouri. Completed plans call for the renovation of a water / sewer project.

Plans and Spec are for Viewing ONLY. Contractors must obtain sets directly from Owner and be placed on the Plan Holders List to be eligible to bid. Questions regarding the bid portal should directed to Ami Willett, Contract Administrator, Missouri S&T at willettar@mst.edu, (573) 341-7618. This project has a three percent (3%) Service-Disabled Veteran Business Enterprises, (SDVE) participation goal. Please see the Information for Bidders and General Conditions for additional information about the SDVE Participation Goal. The Owner reserves the right to waive informalities in bids and to reject any and all bids. Any request for interpretation shall be delivered to the Architect at least one (1) week prior to time for receipt of bids, Questions regarding the bid portal should directed to Ami Willett, Contract Administrator, Missouri S&T at willettar@mst.edu, (573) 341-7618.Questions regarding commercial conditions and bidding policies should be directed to Daren Evens, Project Manager, Missouri S&T at daren.evens@mst.edu, (573) 341-4150. Question Deadline 03/24/2026 SCOPE OF WORK a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on the Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Project consists of replacing four (4) owner provided boilers serving the Geothermal Plant at Straumanis-James Hall. Includes piping connection modification, new flue and intake. (2) Demolition of boilers, pads, intake duct, flue vent, gas piping, condensate piping, electrical, controls, and relief piping completed by Owner, Prior to construction. (3) Mechanical work shall consist of setting four Clever Brooks CFC boilers provided by Owner. Pour housekeeping pads for the boilers. Connect supply return, and gas piping. Install new flue and vent to boilers. (4) Electrical work completed by Owner.

Post-Bid

Water / Sewer

$321,472.00

Public - State/Provincial

Renovation

8

15

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
73
Bidding Soon
974
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

April 30, 2026

Project location map

401 St Patrick's Ln, Rolla, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.