Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2026 at 8:00 PM
Updated March 31, 2026
Renovation of a swimming pool in Littleton, Colorado. Completed plans call for the renovation of a swimming pool.
A construction contract for work and materials is needed to demo and replaster the swimming pool, including new tile for lap lanes and the water line, at 1 Club Drive, Littleton, Colorado 80127. A Request for Proposals (RFP) is available to all prospective bidders by emailing the Facilities Supervisor. Pool Replastering and Tiling at Community Center 1 Club Dr. Littleton Colorado 80127 on Ken-Caryl Ranch in unincorporated Jefferson County, including replastering of 8,800 square feet of the community center pool and 1046 feet of tiling. The square footage for the pool is 8,800 square feet. -Waterline tile is 380 lineal feet -150 lineal feet of trim tile (60 feet of that trim tile is for the break line from the lap part of the pool to the diving well) -Lane tile and targets is 516 lineal feet at one foot in width - two 24x24 main drains
Post-Bid
Swimming Pools
$100,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2026
April 6, 2026
1 Club Dr, Littleton, CO
Related To This Project
Littleton, CO
Bid Date: Mar 18 2026
Littleton, CO
Bid Date: Mar 30 2026
Littleton, CO
--
Littleton, CO
Bid Date: Apr 02 2026
Littleton, CO
Bid Date: Mar 06 2026
Littleton, CO
Bid Date: Mar 25 2026
Littleton, CO
Bid Date: Mar 05 2026
Littleton, CO
Bid Date: Apr 02 2026
Littleton, CO
Bid Date: Mar 20 2026
Littleton, CO
Bid Date: Feb 20 2026
Littleton, CO
Bid Date: Feb 19 2026
Littleton, CO
Bid Date: Mar 19 2026
Littleton, CO
Bid Date: Feb 06 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
