BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Thomas, Oklahoma. Completed plans call for site work for a water / sewer project.

Waterline Extension installing approximately 12,185 linear feet of 2-inch waterline, to support ongoing development initiatives by the Public Service Company of Oklahoma. Pre-Qualification: Yes Pre bid meeting description: ALL CONTRACTORS MUST REGISTER WITH VERO TO PLACE A BID: Getting your company registered with VERO is easy, just go to https://safetymanagementgroup.com/vero/, click VERO Registration at the bottom and follow the prompts. Once you are registered and have uploaded the required documents, VERO will check to make sure that you meet AEP's historical safety metrics requirement. To meet that requirement, you must meet two of the three following criteria: o Previous Year NCCI Experience Modification Rate (EMR) <= 1.0 o Previous 3 Year Total Recordable Incident Rate (TRIR) <= 2.0 o No Fatalities in the previous three years If you meet the historical metrics requirement, VERO will audit your safety program to make sure it meets AEP requirements. Finally, if you are a prime contractor, VERO will review your insurance to make sure it meets your terms with AEP. Please reach out to admin@verodms.com if you have any questions. The work covered by these specifications and drawings shall consist of all materials, transportation costs, equipment, and tools that are related to, or are to be incorporated in this contract and must be received, unloaded, stored, installed, erected, service connections provided, and coordinated with the construction by the CONTRACTOR under this contract. Installation of equipment and materials shall mean furnishing of all labor and materials as required to place the improvements in successful operation. The CONTRACTOR shall be responsible for all equipment and materials and shall replace at his own expense all such equipment and materials found defective in manufacture or damaged in handling after delivery by the manufacturer. The improvements are as listed: PUBLIC SERVICE COMPANY OF OKLAHOMA - WL EXTENSION B. This contract shall include minor items not specifically mentioned herein but shown on the accompanying plans or obviously necessary to provide a complete job. C. The following description, while not intended to cover all details, outlines some items of the work to be accomplished under this Contract: 1. Install 11,185 LF of 2" waterline along SH-54 south to the Traverse Wind Farm facility. D. The price named in the Proposal shall include the furnishing of all labor, material, transportation costs, equipment rental, etc., necessary to construct the project as herein specified and as shown on the accompanying plans. E. The CONTRACTOR shall cooperate with the OWNER during construction so as to place the improvements in operation at minimum inconvenience and without significant disruption to the OWNER. The CONTRACTOR shall minimize his are

Bid Results

Water / Sewer

$293,816.00

Public - City

Site Work

20

16

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
69
Bidding Soon
571
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

June 15, 2026

Project location map

Multiple Locations, Thomas, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.